27
SA FEG E A R® MOTOR CONTROL CE NTE R/A RC- R E S I STA NT M ETA L- CL A D CON STRUC TI ON
1. Scope/Introduction
This procedure applies to the assembly of
the ABB MCC 2.5 frames at the customer
site.
2. Disclaimer
This document was created with the intent
of providing a general instruction guide.
Models shown in this document may not
match exactly with the product you
received.
3. Safety practice
Safety glasses, gloves, and steel toe shoes
should be used as standard safety practice.
4. Target result
5. Tools required (not supplied)
6. Parts required
Colors of parts in this document do not represent actual colors; it is for illustration purposes only.
(8’’ or longer)
Extension– 1
(9/16’’) Socket- 1
Ratchet– 1
1’’ Bolts
Universal joint socket-1
(not supplied)
Pry bar-1
(not supplied)