5
I N S TA L L AT I O N A N D O P ER AT I N G I N S T R U C T I O N S
—
Table of contents
16. Metering module
16.1 To get access to metering module
42
17. Capacitive voltage indicators
43
17.1 Voltage indicators VPIS
18. Additional equipment
44
18.1 Low-voltage connections
18.2 Remote control and monitoring unit
19. Cable testing
45
19.1 Procedure for switchgear with test points
19.2 Procedure for testing directly on the cable
connector with the cable connected to the
switchgear
20. Service and maintenance
46
-49
20.1 General warnings and cautions
20.2 Maintenance intervals
20.3 Inspection general aspects
20.4 Servicing instructions
20.5 Repairs
20.6 Tool list SafeRing XT/SafePlus XT
21. Environmental certification
50
21.1 Life expectancy of product
21.2 Recycling capability
21.3 End-of-life
ANNEX Sample work instruction
51
-52