NOPOWSR 5976 GB
10
ABB / PTMV
SafeRing / SafePlus
SF6 insulated ring main unit and compact switchgear
Installation and operating instructions
4.1 CABLE COMPARTMENT
Removal of cable cover:
NB!
The cable cover can be supplied with interlocking to earthing
switches. When interlocking is fitted, the cable cabinet can only
be accessed when the earthing switch is in the closed position.
4. The panel can be removed by unscrewing A
and B.
2. Removal of front section.
1. Loosen the screws on the cable cover,
pull out and lift cover off.
3. Front section removed.
A
B