S M A RT COM M U N I C ATI ON C A R D
M A N UA L
6
This section describes the basic steps required to commission an architecture consisting of Novolink (OPA UA device), UMC
over Modus TCP, PSTX, CM UFD and CM TCN over Modbus RTU, as shown in the photo below.
1
2
3
6
4
5
7
8
9
Number
Description
Order codes
1
Smart Communication Card
1SVM410000R0000
2
Industrial Edge Gateway (not in scope of this document)
1SDA115509R1
3
24 V DC Power supply
1SVR320361R1000
4
SFM mounted on AF Contactors
1SVM120012R0000
5
Smart Gateway
6
Softstarter PSTX
1SFA898109R7009
7
UMC with PNU module
1SAJ530000R0100
8
CM-UFD
1SVR560731R3701
9
CM-TCN.012
1SVR750740R0120
3.4.
Before you start