10
Control signals
between the
modules
The figure below schematically illustrates how
the closing and alarm signals are connected be-
tween measuring and output relay module.
The functions of the blocking, starting and trip-
ping signals are selected with the switches of
switchgroups SGF, SGB1...3 and SGR1...2. The
checksums of the switchgroups, are found in
the setting menu of the measuring relay mod-
ule. The functions of the different switches are
explained in the user's manual of the measur-
ing module SPCJ 4D40.
Fig. 10. Control signals between the modules of the capacitor bank relay SPAJ 160 C.
IL1
IL3
SGR2 / 3
1
RESET+.
PROGRAM
1
RESET+.
PROGRAM
1
1
SS1
SS2
TS1
TS2
SS3
RESET
TRIP
AR2
AR1
SGB1 / 6
SGB1 / 7
COMPLETE RELAY RESET
SGB1...3 / 8
SGB2...3 / 7
SGB2...3 / 6
TRIP INDICATOR RESET
BS1
BS2
RRES
SGB1..3 / 1
TRIP IND OUTPUT RELAY RESET
IL2
Ia>
ta
70 ms
k
Ib>
∆
I1>
t
∆
1
∆
I2>
k
∆
2
70 ms
SGB1...3 / 2
SGB1...3 / 3
I<
SGB1...3 / 5
SGB1...3 / 4
SGR1 / 1
SGR2 / 1
SGR1 / 5
SGF / 1
SGR1 / 2
SGR2 / 2
SGR1 / 6
SGR1 / 3
SGR2 / 4
SGR2 / 7
SGR1 / 8
SGF / 2
SGR2 / 6
SGR1 / 7
SGR1 / 4
SGR2 / 5
SPCJ 4D40
RECONNECTION INHIBIT
EXTERNAL TRIP
SGR2 / 8
t<
200ms
t rec
COMP
∆
Ics
∆
Ic
∆
I
IRF
START
SIGNAL 2
SIGNAL 1
TRIP
SPTU_R2
A
B
C
D
E
F
RECONN.
INHIBIT