1
About this document
1.1
Function of this document
The document is only applicable for this EVSE (Terra AC), including the variants and
options listed in section
. The EVSE from here on in the document is referred to as
the EVSE.
The document gives the information that is necessary to do these tasks:
•
Installation
•
Commissioning
1.2
Target group
The document is intended for qualified installation engineers.
For a description of the required qualifications, refer to section
1.3
Revision history
Version
Date
Description
001
March 2020
Initial version
1.4
Language
The original instructions of this document are in English (EN-US). All other language
versions are translations of the original instructions.
1.5
Illustrations
It is not always possible to show the configuration of your EVSE. The illustrations in this
document show a typical setup. They are for instruction and description only.
1.6
Units of measurement
SI units of measurement (metric system) are used. If necessary, the document shows
other units between parentheses () or in separate columns in tables.
1.7
Typographical conventions
The lists and steps in procedures have numbers (123) or letters (abc) if the sequence is
important.
1.8
How to use this document
1. Make sure that you know the structure and contents of this document.
2. Read the safety chapter and make sure that you know all the instructions.
About this document
BCM.V3Y01.0-EN | 001
7