60/72
TLE Series 625 to 1000 PurePulse™ UL S2
UPS Installation Guide / REV-B
4.10.3
Control bus cable location
Warning!
This installation must be performed and verified by an ABB Service Technician before the initial
start-up.
Ensure that the ups installation is completely powered down.
Keep SELV cables separated from high voltage cables.
Fig.4.10.3-1 TLE Series 625 & 750
View electronic module on intermediate unit
Fig. 4.9.3-2 TLE Series 1000
View electronic module on intermediate unit
Access to the control bus connection
The communication bus cable connectors are placed on the two boards “
P13/P14 – IM0
2
22 – Bus Interface
Board
”. See Fig. 4.10.3-1 and 4.10.3-2.
Fig. 4.10.3-3 View electronic module on intermediate unit
Control bus cables connection
•
Plug the cables
J1A – J2A
(1/2/3/4/5) and
J1B – J2B
(1/2/3/4/5) on the connectors
J1A – J2A
and
J1B – J2B
placed on the two boards “
P13/P14
–
IM0
2
22
–
Bus
Interface Board
”.
•
Fix the communication bus cables
J1A – J2A
(1/2/3/4/5)
and
J1B – J2B
(1/2/3/4/5) with the provided cable clamps
“
A
”.
- +
1
2
Q1
0 OFF
I O
N
TLES_UL_6
25-750_S2
_RPA conn
ection_AB
B_01
E
P
O
E
P
O
- +
1
2
Q1
0 OFF
I O
N
TLES_UL_1
000_S2_R
PA connect
ion_ABB_0
1
J2
J1
J2
J1
B
A
J1A/1
J1B/2÷5
J1B/1
J1A/2÷5
TLES_160-
400_S2_R
PA connect
ion_ABB_02
-
+
EPO
EPO