54/62
TLE Series 160 to 500 UL S2B
UPS Installation Guide / REV-A
5
Connectivity interface
Fig. 5-1 TLE Series 160 to 500 - Connectivity rack and Serial port J35
µ
P – RS232
TLE Series 160 to 500 has the following equipment’s:
Serial Port J35
µ
P - RS232
(see Section 5.1).
Customer Interface board
(see Section 5.2).
Connectivity rack
ready for the installation of four connectivity boards.
Possible connectivity configurations with TLE Series 160 to 500
Fig. 9-2 Connectivity Slots
For a
Single UPS
it’s possible to install the following
connectivity boards:
-
max. 3 “Customer Interface” boards;
-
max. 2 “3-ph SNMP/WEB Plug-in Adapter” boards.
For a
Parallel System
(max. 6 UPS) it’s possible to install
the following connectivity boards:
-
max. 3 “Customer Interface” boards for each UPS;
-
max. 2 “3-ph SNMP/WEB Plug-in Adapter” boards for
RPA Parallel System.
Note!
The installation of any option board must be performed only by an ABB Service Technician.
Prior to the installation, connection and cabling of any option board the UPS must be completely
powered down and all the power sources that will be connected to the option board must be de-
energized.
Option board shall be connected only to Safety Extra Low Voltage circuits (SELV for IEC-UL-
CSA60950-1): voltage up to 30Vac / 42.4Vpk or 60Vdc maximum and galvanically separated from
AC Mains supply.
Keep SELV cables separated from high voltage cables.
TLE Series 160 - 200 - 225 - 250
TLE Series 300 - 400 - 500
J35µP
- RS232
Connectivity rack
1
2
Q1
I ON
0
O
FF
1
2
E
P
O
E
P
O
-
+
TLE
S_U
L_1
60-
500
_S2
b_U
PS c
onn
ect
ivity
_AB
B_0
1
Q1
1
2
I ON
0
O
FF
E
PO
E
PO
- +
TLES_UL_3
00-500_S
2b_UPS_A
BB_03
J35µP
- RS232
Connectivity rack
J35µP
- RS232
Connectivity rack
CNT_Con
nectivity r
ack_ABB_0
1
SNMP car
d
J3
J2
J5
J4
16
15
4
19
18
17
20
9
8
7
6
5
14
13
12
3
2
1
22
11
2
1
21
10
Customer i
nterface
Summary of Contents for TLE Series
Page 61: ......