Quick installation guide
TRIO-50.0-TL-OUTD-US
ABB solar inverters
1.
Labels and symbols
Inverter models and components
3.
EN
Packing list
5.
Choice of installation location
2.
Assembly instructions
6.
Before starting installation, download the product manual from www.abb.
com/solarinverters. Choose the correct country, string inverters, three phase,
choose the product and proceed to the “download” section.
Read and follow all safety and installation instructions to avoid disabling any
safety features or making the warranty invalid.
The inverter model must be chosen by a specialized technician who has a good knowledge of the installation conditions, the devices that will be installed
externally to the inverter, and whether it will eventually be integrated into an existing system.
The 50kW TRIO module is the same for all inverters, however different AC and DC wiring boxes will have been ordered depending on the site design:
- DC wiring box models: DCWB-1; DCWB-2(12 inputs); DCWB-2(16 inputs).
- AC wiring box models: ACWB Standard; ACWB-A; ACWB-B;
The main features of each wiring box are described at section 15 of this document.
Main components
01
Mounting bracket
02
DC wiring box
03
Conversion module
04
Quick disconnect connector cover
05
AC wiring box
06
Handles
07
Aluminum locking bracket
08
Front cover
09
Communication and control board
10
Positive (+) side string fuses
11
Ground cable attachment points
12
AC filter board
13
DC input terminal block
14
DC disconnect switch
15
DC surge protection device
16
1.1/2” DC conduit opening
17
AC output terminal block
18
AC surge protection device
19
2” DC conduit opening
20
Protective Earth (PE) connection point
21
Anti-condensation valve
22
Negative (-) side string fuses
23
Quick disconnect connectors
24
Spacers
26
Heatsink
27
Rear pins attached to inverter back
side
28
Stabilization bracket
29
Conducting springs
30
Key lock
31
Quick disconnect cover storage rack
32
Ground brackets
33
WiFi antenna opening plug (M20 size)
34
Signal conduit opening for 3/4”
(Pg21 size)
35
1/2” signal conduit opening (Pg16
size) or button to reset AFD fault
36
AC disconnect switch
37
Ground bracket attachment points
38
Marking for 1.1/2” AC conduit opening
39
1.1/2” AC conduit opening
40
Equipment Grounding Conductor
(EGC) connection point
Components included in all DC wiring box models
Quantity
Configurable relay connectors
2
Control and communications signal
connectors
4
M6 hex nut to clamp ground cables
to the wiring boxes
2
M6x16 hex screw
1
Serrated lock M6 washer for securing
the ground terminal to the AC wiring box
6
In additio
n to what
is explain
ed in this
guide, th
e safety a
nd installa
tion inform
ation pro
vided in th
e installat
ion manu
al must be
read and
followed
.
The techn
ical docu
mentation
and the in
terface an
d manage
ment softw
are for th
e product
are availa
ble at the
website.
XXXX
XXXXXXX
XXXX
XXXX
XXXX
XXXXX
XXXXXXXXXX
ABB sola
r inverter
s
Quick installation guide (QIG)
Components included in mounting kit
Quantity
(vertical kit)
Quantity
(horizontal kit)
Bracket
01
for vertical wall mounting
1
0
Bracket
01
for horizontal mounting
0
1
countersunk M5 x 14 hex screws for
assembling the attachment bracket
4
10
6”
20”
12”
6”
12”
8”
NO
NO
NO
NO
NO
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
75° MAX
15° MAX
6”
20”
12”
6”
12”
8”
NO
NO
NO
NO
NO
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
75° MAX
15° MAX
Installation site and position
-
Consult technical data to confirm the environmental specifications will be met
-Installation of the unit in a location exposed to direct sunlight is acceptable.
-Do not install in closed spaces where air does not freely circulate
-
Always ensure that the flow of air around the inverter is not blocked, so as to prevent overheating.
-
Do not install the equipment near flammable substances (minimum distance: 10 ft).
-
Do not install the equipment on wooden walls or other flammable substances.
- Do not install in rooms inhabited or where the prolonged presence of people or animals is expected, because
of the inverter’s noise level during operation. The sounds level is heavily influenced by its location (for
example, the surface around the inverter, the environment, etc.) and grid quality.
-Install on a wall or strong structure capable of bearing weight
- Install vertically or horizontally (i.e. with the inverter on its back), with a maximum inclination as indicated
in the figure
- Maintain minimum clearance from objects blocking air circulation and spacing between inverter as
indicated in the figures
-
Ensure sufficient working area in front of the inverter for wiring box access
- If possible, install at eye-level so that the LEDs can be easily seen
- Install at a height that takes account of the weight of the equipment
- Position multiple inverters side-by-side, maintaining minimum clearances (measured from the outermost
edge of the inverter)
- Multiple inverters can also be placed in a staggered arrangement. Minimum clearances for staggered
arrangements include width of inverter plus additional allowances for inverters arranged above or below
-All installatioins over 6500’ (2,000 meters) must be assessed by ABB Technical Sales to determine the
proper datasheet derating
Do not block access to the external AC and DC disconnects.
Please refer to the warranty terms and conditions and avoid voiding the warranty with improper
installation.
EGC
+IN
-IN
+IN
FUSE1
FUSE2
FUSE3
FUSE4
FUSE5
FUSE6
FUSE7
FUSE8
FUSE9
FUSE10
FUSE11
FUSE12
-IN
FUSE1
FUSE2
FUSE3
FUSE4
FUSE5
FUSE6
FUSE7
FUSE8
FUSE9
FUSE10
FUSE11
FUSE12
ATTENTION
UTILISEZ SEULEMENT CÂBLES EN CUIVRE OU ALUMINIUM 75 °C OU 90 °C. Consultez le
manuel d'instructions pour la taille des fils approprié (AWG) et pour couples de serrage
à appliquer aux bornes de câblage.
CAUTION
USE 75 °C OR 90°C COPPER ORALUMINIUMWIRE ONLY. Refer to the instruction manual for
suitablewiresize(AWG)andfortighteningtorquetobeappliedtothewiringterminals.
CAUTION
ATTENTION
USE 75 °C OR 90°C COPPER WIRE ONLY. Refer to the instruction
manual
for suitable wire size (AWG) and for tightening
torque to be applied to
the wiring terminals.
UTILISEZ SEULEMENTCÂBLES EN
CUIVRE 75 °C OU 90 °C. Consultez
le manuel d'instructionspour la
taille des fils approprié(AWG) et
pour couples de serrage à
appliqueraux bornes de câblage.
+IN
FUSE1
FUSE2
FUSE3
FUSE4
FUSE5
FUSE6
FUSE7
FUSE8
FUSE9
FUSE10
FUSE11
FUSE12
FUSE13
FUSE14
FUSE15
FUSE16
-IN
FUSE1
FUSE2
FUSE3
FUSE4
FUSE5
FUSE6
FUSE7
FUSE8
FUSE9
FUSE10
FUSE11
FUSE12
FUSE13
FUSE14
FUSE15
FUSE16
DCWB-2 16 inputs
Side view (DC)
(All models)
DCWB-1
09
31
13
40
32
16
19
30
33
35
34
37
23
11
21
22
10
40
40
09
31
15
14
32
DCWB-2 12 inputs
16
19
22
10
09
31
15
14
32
16
19
ACWB
ACWB-A
ACWB-B
12
31
17
39
20
12
31
36
17
18
18
39
20
12
31
39
20
32
32
32
Side view (AC)
(All models)
11
23
37
21
30
40
38
Mounting on a vertical wall
1. The bracket
01
is supplied in two separate parts, assemble them using the four
M5x14 countersunk screws.
(FIG. 1)
2. Position the bracket
01
perfectly level on the wall and use it as a drilling
template.
(FIG. 1)
3. It is the installer’s responsibility to choose an appropriate number and and
distribution of attachment points. The choice must be based on the type of
wall, frame or other support, the type of anchors to be used, and their ability
to support 4 times the inverter’s weight (4 x 260 lbs=1040 lbs for all models).
Attach the bracket to the wall with at least 10 attachment srews. Depending
on the type of anchor chosen, drill the required 10 holes
A
to mount the
bracket. Put at least four srews in the upper side and at least four in the lower
side, with the remainder (up to 20 total) in either location.
(FIG. 1)
4. Attach the bracket to the wall or frame
(FIG. 1)
5.
Install spacers
24
in the two lower rear attachment pins
27
of the conver-
sion module. This will prevent backwards tilt when the conversion module
is hung on the bracket.
(FIG. 2)
6.
Lift the power module up to the bracket using the (optional) handles
06
or the
(optional) M12 eyebolts, or another appropriate lifting device.
(FIG. 2)
7. Side the heads of two upper rear attachment pins
27
into the slots on
the bracket and confirm that the slots
on the bracket are aligned with
the line on the sides of the conversion module; this indicates that they
have been correctly positioned.
(FIG. 2)
8. Remove handle or eye bolts (if used)
9. Remove the quick disconnect connector covers as follows :
- Pull the aluminum locking bracket outwards
A
(FIG. 3)
- Pull off the quick disconnect cover
B
(FIG. 3)
- Save both parts. They will be needed in a later step.
10.
Set the wiring box disconnect switches to “0”.
11.
Unscrew the 8 screws holding the front covers
08
of the DC wiring
box
02
and AC wiring box
05
in place.
12. Open the key locks and remove the covers of each wiring box.
(FIG. 4)
13.
Install spacers
24
in the lower rear attachment pin
27
of each wiring box. This
will prevent backwards tilt when the wiring box is hung on the bracket.
(FIG. 4)
14.
Remove the quick disconnect connector covers from both wiring boxes
(See step 9 of this procedure)
(FIG. 4)
. Caps should be kept in the
special slot within each wiring box. Proceed as follows:
-
A
couple a connector cap of the power module (in green in the figure)
with one from the wiring box (in blue in the figure).
-
B
Insert the plastic locking bracket used to block the wiring box cap
on the coupled connectors.
-
C
Insert the two connectors locked by the fork in the dedicated space within
each wiring box
D
. Repeat the same operation for the other wiring box.
Do not use aluminum locking bracket to clamp the caps. (FIG. 5)
01
A
A
A
A
A
A
A
A
A
A
B
B
01
A
A
A
A
A
A
A
A
A
A
B
B
FIG 1
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS -- KEEP IN A SAFE PLACE!
The installer must read this document in its entirety before installing or commissioning this equipment.
For more detailed information regarding proper installation and use of this product, refer to the product manual located at www.abb.com/solarinverters. The
labels on the inverter carry the markings, main technical data and identification of the equipment and manufacturer. The technical data shown in this quick
installation guide does not replace that shown on the labels attached to the equipment.
Symbols used in the guide and on the products
These are nationally recognized test laboratory marks
showing certification to UL 1741 and CSA-C22 No. 107.1-01
ø
Phase
Hazardous voltage
Direct and alternating currents, respectively
General warning - Important safety information
+ -
Positive and negative of the input voltage (DC)
Hot surfaces
10
Stored energy discharge time
System earth conductor (main grounding protective
earth, PE)
Consult product manual
Equipment Grounding Conductor (EGC)
- This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions:
(1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Components included in mounting kit
Quantity
(vertical kit)
Quantity
(horizontal kit)
M6x16 hex screw (4 to clamp ground
brackets and 2 for caged nuts)
6
6
Stabilization brackets to attach the
conversion module to the wiring box
2
2
M6 cage nuts
2
2
M6 hex nut to clamp ground cables to
the conversion module
2
2
Back spacers
24
for wall alignment
(vertical installation)
4
0
Ground cables for wiring box/power
module connection
2
2
Ground brackets
32
for wiring box-
power module connection
2
2
M6 flat washer (4 for ground
brackets and 2 for cage nuts)
6
6
Serrated lock M6 washer for ground
connection bracket
8
8
Conducting springs
6
6
27
27
24
A
B
27
04
27
24
02
27
07
07
08
23
04
08
A
B
C
D
D
DC Wiring box
AC Wiring box
FIG 3
FIG 5
FIG 2
FIG 4
6”
20”
12”
6”
12”
8”
NO
NO
NO
NO
NO
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
75° MAX
15° MAX
6”
20”
12”
6”
12”
8”
NO
NO
NO
NO
NO
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
75° MAX
15° MAX
Vertical installation bracket
Horizontal installation bracket
27
06
07
07
37
32
37
23
05
31
14
30
23
04
08
04
30
01
02
03
26
29
14
28
08
BCM.V2D01.0