INTERLOCKS BETWEEN PANELS
APPAR ATUS CO NTRO L TESTING
48
1VLG5000 17 C
Step 1/4
All circuit breakers in the relative section are in the test position. Check the circuit breakers
status via the protection relay LHMIs.
Figure 71: Single line diagram, the circuit breaker is in the test position
Step 2/4
Check the busbar earthing switch shutter. It can be open and the crank inserted.
Step 3/4
Fix the shutter in the open position.
Step 4/4
Check that no circuit breakers in the section can be moved out of the test position no more
than a half turn of the crank.
Summary of Contents for UniGear Digital
Page 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Page 2: ......
Page 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Page 6: ......
Page 10: ......
Page 12: ......
Page 96: ......
Page 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...