INTERLOCKS BETWEEN PANELS
APPAR ATUS CO NTRO L TESTING
50
1VLG5000 17 C
Step 2/10
Close the circuit breaker in the feeder to be tested. Check the circuit breaker status on the
protection relay LHMI.
Figure 74: Single line diagram circuit, the circuit breaker is closed and in the service position
Step 3/10
Close all upstream breakers in the relative section, such as the Incomer, Generator and Bus
tie.
Step 4/10
On the protection relay LHMI (upstream breaker receiving CBFP trip command) go to -> Main
Menu/Test/IED test
–
Test mode = IED test
The ready LED is flashing when the protection relay is in the test mode.
Figure 75: Entering test mode
Step 5/10
On the protection relay LHMI (tested feeder) go to -> Main Menu/Test/IED test
–
Test mode = IED test
The ready LED is flashing when the protection relay is in the test mode.
Summary of Contents for UniGear Digital
Page 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Page 2: ......
Page 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Page 6: ......
Page 10: ......
Page 12: ......
Page 96: ......
Page 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...