LIST OF DRAWINGS
FIG. NO. NAME OF THE FIG.
1a.
Standard General Arrangement Drawing
of VBF Breaker with breaker & CT structure
1b. Standard General Arrangement Drawing
of VBF Breaker (with breaker structure)
1c. Standard General Arrangement Drawing of VBF
breaker control cabinet at lower height
(with breaker structure)
4a, b & c. ESH mechanism with cabinet
5. Dismantling of operating coils setup.
6. Steps for replacement of shunt opening release (Y02).
7. Steps for replacement of shunt opening release (Y01).
8. Steps for replacement of shunt closing release (YC).
9. Operating Coils setup for temperature -10°C
10 - 11 Steps for replacement of motor.
12. Motor.
13 - 14. Steps for replacement of micro-switches.
46
List of Drawings