background image

Page 7

 

© 2023 ABB. All rights reserved.

 

BDFB Gateway_QSG

 

Rev. 2.0

 

QUICK START GUIDE

 

VIM1EC Meter Parameters

 

 

1

 

 System Voltage

 

2

 

 Local Buzzer

 

3

 

 Display Contrast

 

4

 

 Software Version

 

 

5

 

 Number Of Loads

 

6

 

 Meter Type

 

 

7

 

 Load ID Format

 

8

 

 First Load (location)

 

9

 

 Shunt Rating

 

10

 

 Overload Latch

 

11

 

 Combined Load

 

 

12

 

 Load Available

 

13

 

 

Load Power Loss

 

14

 

 Load overload Type

 

15

 

 Load Overload

 

16

 

 Load Overload Delay

 

17

 

 Assigned Circuits

 

18

 

 Start Lamp Test

 

19

 

 Clear Latched Events

 

20

 

 Start Alarm Test

 

21

 

 Device ID

 

Information: VIM1EC Meter 

(Continue)

 

Summary of Contents for VIM1EC

Page 1: ...vent contact with other DC buses and grounded metal Before getting started have the following tools and information available IP Address and other network information from Systems Administrator PC or Laptop with RS 232 and Easyview2 installed RS 232 cable Torque wrench 0 240 in lb 28 Nm Gateway installation only Screw Driver Phillips 2 retrofit only Socket 5 16 retrofit only EasyView2 is the graph...

Page 2: ...her a Gateway Assembly or by a GPS system controller 2 Gateway Assembly connection for terminating resistor Gateway Assembly with one BDFB install the terminating resistor TR 450050642 In Position 1 of the RJ485 adapter on the bracket 3 RS485 connection to next RS485 device or terminating resistor Gateway Assembly multiple BDFBs or GPS system install the terminating resistor in the last RS485 devi...

Page 3: ... to access its ports four screws 1 Remove the top BDFB rear access panel 2 Verify polarity of bus bars with a meter before making connections 3 Remove the protective cover of the Gateway kit rear panel only four screws 4 Connect the Gateway card to BDFB power using the 850048025 wire set provided with the kit a If connection points shown at right have Faston blades replace the ring terminals of th...

Page 4: ...trator Password administrator 5 Configure the IPV4 or IPV6 settings on the Settings Network Settings screen 6 Configure password under Settings Passwords Go to Step V1 if installing a VIM1EC Meter Go to Step V3 if connecting to an existing VIM1EC Meter Step V1 Record Configuration of Existing VIM1 Meter See Information VIM1EC Meter for Meter Parameters table and Menu Map Number Of Loads Item 5 Met...

Page 5: ... 4 Repeat from 2 above for each additional VIM1EC Meter if installing a Gateway Assembly connecting to multiple VIM1EC Meters Step V5 Connect the VIM1EC to the RS485 Daisy Chain Network 1 or 2 RS485 cables will be run to the back of the VIM1EC within the BDFB to other RS485 daisy chain devices The RS485 Daisy Chain Network may be mastered by a Gateway Assembly or by a controller in a GPS system Se...

Page 6: ...uipped with a shunt 1500 A for G7 and G8 1600 A for G101 and G102 The VIM1C monitors these shunts to determine actual currents and the remaining capacity of each load bus VIM1C features include fuse breaker alarms power loss alarms individually configurable overload thresholds individually configurable power loss audible and remote form C output alarms The VIM1 receives redundant power from the A ...

Page 7: ...ware Version 5 Number Of Loads 6 Meter Type 7 Load ID Format 8 First Load location 9 Shunt Rating 10 Overload Latch 11 Combined Load 12 Load Available 13 Load Power Loss 14 Load overload Type 15 Load Overload 16 Load Overload Delay 17 Assigned Circuits 18 Start Lamp Test 19 Clear Latched Events 20 Start Alarm Test 21 Device ID Information VIM1EC Meter Continue ...

Page 8: ... at www abbpowerconversion com Drawings and other engineering information are available Contact Technical Support at 1 877 546 3243 1 972 244 9288 Email techsupport elpc abb com 4530236P 6420883P Kit 5069 BDFB VIM1EC Retrofit CC848815341 Pulsar Plus Controller Family Product Manual CC850018552 H569 445 Battery Distribution Fuse Circuit Breaker Bay BDFB BDCBB ESAPP VIM1 ESAPP VIM1 Smart Distributio...

Page 9: ...Page 9 2023 ABB All rights reserved BDFB Gateway_QSG Rev 2 0 QUICK START GUIDE NOTES ...

Page 10: ...Page 10 2023 ABB All rights reserved BDFB Gateway_QSG Rev 2 0 QUICK START GUIDE NOTES ...

Page 11: ...r possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB Copyright 2023 ABB All rights reserved ABB 601 Shiloh Rd Plano TX USA abbpowerconversion com Page 11 202...