ABB Turbocharger VTC..4
Seite / Page 49
Demontage und Montage
Kap. / Chap. 5
Disassembly and assembly
ABB Turbo Systems Ltd
HZTL 10104
- D -
ABB
7 Tabelle der Anziehmomente
Für allgemeine Schrauben der Festigkeitsklasse 8.8
gelten folgende Anziehmomente:
7 Table of tightening torques
For standard screws with mechanical properties of 8.8
the following tightening torques are applicable:
Pos.
Pos.
Teil-Nr.
Part-no
Anziehmomente [Nm]
Tightening torques [Nm]
Bemerkungen
Remarks
VTC214
VTC254
VTC304
1
21002
M 18
45
M 18
45
M 22
75
2
81109
82006
M 12 x 1,5
45
M 12 x 1,5
45
M 12 x 1,5
45
3
4
5
6
82004
81107
74008
42006
M 16 x 1,5
45
M 16 x 1,5
45
M 16 x 1,5
45
7
81103
M 10
25
M 16
100
M 16
100
8
51011
---
---
M10
25
VTC..4P
Screws with Verbus disc:
Schrauben
Screws
M4
M5
M6
M8
M10
M12
M16
M20
M22
M24
Anziehmomente [Nm]
Tightening torque [Nm]
3
6
10
25
45
75
190
380
430
540
Schrauben
Screws
M10
M12
M16
M20
Anziehmomente [Nm]
Tightening torque [Nm]
75
105
260
500
Schrauben mit Verbusripp-Scheiben:
Hinweis
Die Verbusripp-Scheibe darf im trocke-
nen oder geölten (empfohlen) Zustand
montiert werden, es darf jedoch KEIN
FETT eingesetzt werden um eine Über-
lastung der Schraube zu verhindern.
Für die in der unteren Tabelle angezogenen Schrau-
benverbindungen müssen folgende Anziehmomente
eingehalten werden:
Note
The Verbus disc may be installed in dry
or oiled (preferred) condition, however
NO GREASE may be used to prevent
an overload of the screw.
For the screws in below mentioned table the following
tightening torques have to be applied:
Summary of Contents for VTC 4 Series
Page 4: ......
Page 5: ...0 Preliminary remarks Vorbemerkungen...
Page 6: ......
Page 18: ......
Page 19: ...1 Instructions on safety and hazards Sicherheits und Gefahrenhinweise...
Page 20: ......
Page 34: ......
Page 35: ...2 Putting into operation Inbetriebnehmen...
Page 36: ......
Page 53: ...3 Operation and maintenance Betrieb und Unterhalt...
Page 54: ......
Page 91: ...Troubleshooting Beheben von St rungen 4...
Page 92: ......
Page 99: ...Disassembly and assembly Demontage und Montage 5...
Page 100: ......
Page 150: ......
Page 151: ...Taking out of operation Ausserbetriebnehmen 6...
Page 152: ......
Page 162: ......
Page 163: ...Appendix Anhang 7...
Page 164: ......
Page 166: ...10106 ABB Turbo Systems Ltd C Seite Page 2 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix...
Page 179: ......
Page 204: ......
Page 206: ...ABB Turbo Systems AG Bruggerstrasse 71a CH 5400 Baden Switzerland ABB...