Turbocharger VTR..4
Seite / Page 11
Inbetriebnehmen
Kap. / Chap. 2
Putting into operation
ABB Turbo Systems Ltd
10030
- D -
ABB
4
Inspection during
putting into operation
Inspection work includes preventive visual controls,
as well as monitoring and measurement to ensure
the correct functioning of the turbocharger. These
serve as an aid for the recognition of deviations before
and during putting into operation in order to prevent
damage to the machine.
- Control and measurement checks must be carried
out at the listed inspection points at the intervals
quoted below.
- Before and during inspection work, the safety
instruc-tions cited (in chap. 1) must be observed.
4.1
Outline of inspection work
Inspection symbols and intervals
Inspection location
Inspection point
(visible in the outline)
Inspection point
(not visible in the outline)
Inspection
Recording of measurement values
Abbreviations for the inspection times
Before
before putting into operation
After
after putting into operation
4
Prüfarbeiten bei
Inbetriebnahme
Diese Prüfarbeiten sind vorbeugende Sichtkontrollen,
Überwachungs- und Messarbeiten, die die Funkti-
onsfähigkeit des Turboladers sicherstellen. Sie hel-
fen, Abweichungen vor und bei Inbetriebnahme zu
erkennen und dadurch Maschinenschäden frühzeitig
zu verhindern.
- In den unten angegebenen Zeitabständen sind an
den aufgelisteten Prüfstellen Kontroll- und
Messarbeiten durchzuführen.
- Vor und bei allen Prüfarbeiten sind die Sicherheits-
hinweise (in Kap. 1) zu beachten.
4.1
Übersicht Prüfarbeiten
Prüfsymbole und -zeiten
Prüfort
Prüfstelle
(in Übersicht sichtbar)
Prüfstelle
(in Übersicht verdeckt)
Prüfen
Messwerte erfassen
Kurzbezeichnung der Prüfzeitpunkte
vor Inbetr.
vor Inbetriebnahme
nach Inbetr.
nach Inbetriebnahme
Summary of Contents for VTR184-21
Page 1: ...Operation Manual VTR184 11 21 ZTL2106 Turbocharging ABB Turbo Systems Ltd...
Page 4: ......
Page 5: ...0 Preliminary remarks Vorbemerkungen...
Page 6: ......
Page 18: ......
Page 19: ...1 Instructions on safety and hazards Sicherheits und Gefahrenhinweise...
Page 20: ......
Page 34: ......
Page 35: ...2 Putting into operation Inbetriebnehmen...
Page 36: ......
Page 53: ...3 Operation and maintenance Betrieb und Unterhalt...
Page 54: ......
Page 99: ...Troubleshooting Beheben von St rungen 4...
Page 100: ......
Page 107: ...Disassembly and assembly Demontage und Montage 5...
Page 108: ......
Page 162: ......
Page 163: ...Taking out of operation Ausserbetriebnehmen 6...
Page 164: ......
Page 180: ......
Page 181: ...Appendix Anhang 7...
Page 182: ......
Page 184: ...10021 ABB Turbo Systems Ltd E Seite Page 2 ABB Turbocharger VTR 4 Anhang Kap Chap 7 Appendix...
Page 228: ......
Page 229: ...Approved lubricating oils Zugelassene Schmier le 8 1...
Page 230: ......
Page 234: ......
Page 236: ......
Page 237: ......
Page 238: ...ABB Turbo Systems AG Bruggerstrasse 71a CH 5400 Baden Switzerland ABB...