Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
11
3.4.2 Lifting the tap-changer out of the transport box
Procedure
1.
Make sure that the crane is approved for lifting the weight of the tap-changer. Refer to the net weight
on the packing list.
2.
Remove the cover (1) and the sides (2) of the
transport box.
G004258
3.
Remove all accessories from the transport box,
and then remove the straps (7).
G004525
4.
Put the soft lifting sling (4) around the cylinder,
and then attach the soft lifting sling to the lifting
eye (3).
CAUTION!
Make sure that the crane hook is
exactly above the center of gravity (4).
The contacts can break if the
tap-changer moves in the soft lifting
sling.
G004257
5.
Carefully lift the tap-changer.
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...