Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
17
2.
Install the gasket in the groove (3) in the
transformer cover.
NOTE!
The gasket is not included in the
tap-changer delivery.
G004261
3.
Attach lifting chains (4) to the lifting eyes, and lift
the tap-changer.
CAUTION!
Make sure that the angle between the
lifting chains (4) is less than 90°.
A greater angle can cause deformation
of the lifting eyes.
G004254
4.
Carefully lower the tap-changer into the
transformer.
CAUTION!
Do not cause damage to the
terminals (5). The terminals (5) can
easily bend or break if they catch on
the transformer cover.
G004263
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...