18
Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
5.
Turn the tap-changer as necessary to make
installation of drive shaft and pipes possible.
Please refer to the transformer manufacturer´s
documentation.
NOTE!
The bevel gear (1) must be within the
limits (9).
G004260
6.
Remove the lifting chains from the lifting eyes.
G004264
7.
Install the washers and nuts on the stud bolts (1),
and tighten the nuts.
G004265
Torque
M12 49 Nm
End of instruction
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...