4.
Install the gude pins (7) in the flange.
NOTE!
The guide pins are delivered with the
tap-changer.
G006833
5.
Make sure that the holes (6) in the yoke fits the
guide pins.
NOTE!
The guide pins are Ø 7 mm.
G004266
6.
Put the tap-changer on the yoke.
G004267
7.
Turn the tap-changer as necessary, to make installation of drive shaft and pipes possible. Please refer
to the transformer manufacturer's documentation.
End of instruction
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...