24
Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
8.
Install the top flange (5):
1.
Install the bolts (4), spring washers and plain
washers.
2.
Tighten the bolts (4) in a crosswise
sequence.
G00431
1
Torque
24 Nm
9.
Install the nuts (8) and plain washers.
G004265
Torque
84 Nm ± 10 %
10.
Install the top cover (2), and then install the
bolts (1).
CAUTION!
Hold the top cover 10 cm above the
tap-changer and carefully lower it
straight down. The shaft for the bevel
gear can bend if the top cover is not
lowered straight down.
NOTE!
There is a guide pin (3) in the top
flange that fits in a hole in the top
cover.
G004269
Torque
47 Nm
End of instruction
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...