Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
35
7.
Put the protection tubes together with the slotted
ends (5) outwards.
G004383
8.
Put the hose clamps (6) on the protection tubes.
NOTE!
Do not tighten the hose clamps (6).
9.
Apply grease to the spherical shaft ends (7) and
the unpainted surfaces on the bevel gears.
G004384
10.
Install two coupling halves (3) on one side of the
drive shaft.
Tighten the hex screws (2) with your fingers.
G004377
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...