Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
39
2.
Measure the length (K2) between the spherical
shaft-ends.
G004391
3.
Calculate the drive shaft length and subtract 6 mm from the length K2.
Cut the drive shaft to length (K2 - 6 mm).
4.
Remove burrs and loose material from the drive shaft.
5.
Calculate the correct length (LB2) for the protection tubes, refer to the table.
Example: if the length of K2 is 390 mm, then LB2 is = (390 +210) / 2 = 600 / 2 = 300 mm.
For K2 (mm)
Calculate LB2 (mm)
200 to 290
(K2 + 180) / 2
291 to 600
(K2 + 220) / 2
Greater than 600
(K2 + 410) / 2
6.
Cut the two protection tubes at the end (1) that is
not slotted.
CAUTION!
Remove the tube end (1) that is not
slotted.
G004392
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...