Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
45
4.
If the roller is not in the correct position:
1.
Put the hand crank (6) on the shaft end (5).
2.
Turn the hand crank (6) until the roller is in
the correct position (4), at the center of the
notch.
NOTE!
One complete switching operation
takes 11.5 ± 1 turns on the hand
crank (6).
G004436
5.
Make sure that the position indicators (7) and (8)
show the same position.
CAUTION!
If the position indicators show different
positions, catastrophic failure of the
transformer can occur.
G004437
6.
Install the two bolts in the multi-hole coupling
flange (11).
G004442
End of instruction
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...