46
Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
6.3.2 Synchronization of BUE2
Procedure
1.
Open the door (1).
G004438
2.
Open the inner panel (2).
3.
Inspect the brake assembly make sure that the
motor-drive mechanism is in the correct position.
NOTE!
The brake assembly is at position (3).
NOTE!
The correct position is when the brake
is centered on the red line (4).
G004439
4.
If the roller is not in the correct position:
1.
Put the hand crank (6) on the shaft end (5).
2.
Turn the hand crank (6) until the roller is in
the correct position (4), centered on the red
line.
NOTE!
One complete switching operation
takes 19 ± 1.5 turns on the hand
crank (6).
G004441
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...