8 Electrical connection and testing
8.1 Connection of the operational circuits
Procedure
1.
Put a flexible cable (1) between the grounding
stud on the tap-changer and a grounding point in
the transformer.
G004464
2.
Put a flexible cable (1) between the grounding
stud on the motor drive and a grounding point in
the transformer.
G004466
3.
Connect the motor supply. Refer to the circuit diagram that is supplied with the motor-drive.
4.
Connect the control supply. Refer to the circuit diagram that is supplied with the motor-drive.
End of instruction
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...