Operation Manual / 4 Product description / A100-L
6 Periodic maintenance / 6.5 Cleaning the turbine during operation
© Copyright 2020 ABB. All rights reserved.
HZTL4034_EN
Rev.P
January 2020
6.5.2
Procedure for dry cleaning the turbine
Dry cleaning device
Fig. 20: Overview of dry cleaning device
11
Granulate container (51702)
16
Protection valve [closed] (51713)
12
Cover cap (51703)
17
Pressurised air valve [venting] (51704)
13
Pressurised air supply [4 ... 7 bar]
18
Plate
14
Piping
19
Cleaning instructions (51717)
15
On-Off valve [closed] (51705)
20
Gas inlet casing, insulated
CAUTION
Protecting the pressurised air system
u
Protect the pressurised air system against overpressure (> 7 bar).
Page
41
/
112