Operation Manual / A100-L
9 Disassembly and assembly / 9.13 Dismantling the nozzle ring (
≥
A180-
L)
© Copyright 2021 ABB. All rights reserved.
HZTL4034_EN
Rev.T
December 2021
Fig. 47: Dismantling the nozzle ring
1. Loop around the nozzle ring holder (90477) with the lifting gear and secure it to the
crane.
2. Loosen screws (56014) and remove with washers (56011).
3. Pull the nozzle ring (56001) towards the front onto the nozzle ring holder.
4. Screw the screws (B
2
) into the nozzle ring holder.
5. Remove screws (B
1
).
Fig. 48: Put down the nozzle ring
u
Use the crane to remove and put down the nozzle ring (56001).
Page
89
/
141