99
1
O PER AT I O N , M A I N T EN A N C E , A N D I N S TA L L AT I O N G U I D E
—
Fig. 7.3 ZTG, Open transition system diagram
OPEN TRANSITION POWER PANEL COMPONENT DIAGRAM
J5: ATS COMMAND OUT
AUTOMATIC TRANSFER SWITCH
LIMIT SWITCH ACTUATION CHART
X = ACTUATED
SN-1
SE-1
ATS CONTACT LOCATON
SOURCE1
SOURCE2
x
x
LOCATED ON
TRU CONTROL
ASSEMBLY
LOCATED ON
POWER PANEL
ASSEMBLY
J11: ATS STATUS SW
LOCATED ON
TRU CONTROL
ASSEMBLY
Summary of Contents for Zenith ZTG T Series
Page 2: ...2 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Page 6: ...6 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Page 10: ...10 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Page 38: ...38 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Page 60: ...60 ZENITH ZTG D CT T SERIES 1600 3000 A 1 LCD ...
Page 104: ...104 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Page 116: ...2 116 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Page 120: ...2 120 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Page 123: ...123 1 OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...