10
PrimeGear ZX0
P R O D U C T M A N U A L
—
Fig. 1.4.3.1: Support
plates fitted
—
Fig. 1.4.3.2: Hydraulic
lift trolley
1.4.3 Handling by hydraulic lift trolley
When moving panels of 450 mm width,
fit the lateral support plates supplied as
shown in Fig.1.4.3.1 to prevent them from
tipping. Remove the cover on the cable
termination compartment and bolt the
support plates to the side walls of the
cable termination compartment.
Attach hydraulic lift trolleys of sufficient capacity
to the front and rear of the panel in accordance
with the manufacturer’s instructions (Fig.1.4.3.2).
The high centre of gravity means there is
a high risk of tipping. Avoid jerky
motions!
1.5 Intermediate storage
•
Store the panels in the upright position.
•
Do not stack the panels.
•
Protect the transport units from damage.
The conditions for optimum intermediate storage
without packaging or with basic packaging are
as follows:
•
The storeroom must comply with the normal
operating conditions for a switchgear
installation (see IEC 62271-1 | GB/T 11022).
•
Cover the unpackaged panels with protective
sheeting, remembering to preserve sufficient
air circulation.
•
Prevent condensation on the panels by partially
opening the packaging and heating the
storeroom accordingly.
The conditions for optimum intermediate storage
with packaging and preservation are as follows:
•
Check the packaging for damage.
•
Store the transport units in a dry place protected
from the weather.
•
Contact us if.
- the storage life of the preservation is exceeded.
- the packaging with preservation is damaged.
8 x Cheese head screw M 8 x 25
16 x Dished washer 8
8 x Nut M 8
2 x Support plate
—
Fig. 1.4.3.1
—
Fig. 1.4.3.2