www.ABBALightingUSA.com
Confirm that the metal plate is firmly and
evenly attached to the wall, without any
wobbling or misalignment.
Use a level to verify that the metal plate is
horizontally or vertically aligned, as desired.
13.Place the metal plate against the wall, aligning
the screw holes with the pilot holes you created.
14.Take the screws and insert them through the
holes in the metal plate, one at a time. For deck
installation, position the metal plate carefully
within the hole.
15.Using a screwdriver, tighten the screws
gradually and evenly, ensuring a secure
attachment of the metal plate to the wall. Be
cautious not to overtighten and damage the wall
surface.
16.Remember to test the fixture after making any
adjustments to ensure it is functioning correctly
and that the lighting is set to your preferences.
18.Once the fixture(s) have been installed
securely, it's time to turn on the power and enjoy
the enhanced lighting experience! Locate the
power switch or breaker that controls the
fixture(s) and turn it on. Take a moment to
observe the lighting effect
Remember to regularly maintain and clean the
fixture(s) to ensure optimal performance and
longevity.
17. Place the top cover of the fixture in position
and proceed to secure it by tightening the screws
firmly.
MAIN LINE
WN12
Attach the wires from the
fixture(s) to the main cable, For
best results, we recommend
using WN12 waterproof wire
nuts (which are sold separately)