background image

www.ABBALightingUSA.com

Confirm  that  the  metal  plate  is  firmly  and
evenly  attached  to  the  wall,  without  any
wobbling or misalignment.
Use  a  level  to  verify  that  the  metal  plate  is
horizontally or vertically aligned, as desired.

13.Place  the  metal  plate  against  the  wall,  aligning
the screw holes with the pilot holes you created.

14.Take  the  screws  and  insert  them  through  the
holes  in  the  metal  plate,  one  at  a  time.  For  deck
installation,  position  the  metal  plate  carefully
within the hole.

15.Using  a  screwdriver,  tighten  the  screws
gradually  and  evenly,  ensuring  a  secure
attachment  of  the  metal  plate  to  the  wall.  Be
cautious  not  to  overtighten  and  damage  the  wall
surface.

  
16.Remember to test the fixture after making any
adjustments  to  ensure  it  is  functioning  correctly
and that the lighting is set to your preferences. 

18.Once  the  fixture(s)  have  been  installed
securely, it's time to turn on the power and enjoy
the  enhanced  lighting  experience!  Locate  the
power  switch  or  breaker  that  controls  the
fixture(s)  and  turn  it  on.  Take  a  moment  to
observe the lighting effect  

   Remember to regularly maintain and clean the
fixture(s)  to  ensure  optimal  performance  and
longevity. 

17.  Place  the  top  cover  of  the  fixture  in  position
and proceed to secure it by tightening the screws
firmly.

MAIN LINE

WN12

Attach the wires from the

fixture(s) to the main cable, For

best results, we recommend

using WN12 waterproof wire

nuts (which are sold separately)

Reviews: