(Figure 6.)
A
B
C
D
E
1
2
3
4
5
6,8,9
7
10
Safety valve
Outlet line
Connection for the flue pipe
Return line
Connection for the fresh air supply
Safety valve discharge drain
Thermometer
Pressure gauge
Balance valve
Thermostatic mixing valve 55°C
Valve
Installation refilling system
Drain to the sewer
3bar
Hot water
Ø 120mm
Cold water
Ø 60mm
Prior to the stove first ignition make sure that:
§
All tools are removed from the stove (user manual, power cable)
§
The stove is connected to the pipeline and filled with water
§
The air vent cover under the stove cover is open
§
The flue outlet is connected to the chimney
§
The door is closed and the ash trap is place
§
The hopper is loaded with pellets
15
Summary of Contents for 23kW SUPER VULCANO
Page 1: ...USER MANUAL FOR 23kW SUPERVULCANO PELLETSTOVE ...
Page 25: ......