c 2014 ABH Mfg., Inc.
printed in USA
R
O
www.abhmfg.com
E-mail: abhinfo@abhmfg.com
Architectural Builders Hardware Mfg., Inc.
1222 Ardmore Ave., Itasca, IL 60143
630.875.9900; FAX 800.9FAXABH (932.9224)
6800-4-04.DWG
6800-4
REVISED 09-16-14
PHILLIPS PAN HD. M.S.
NOTE: REVERSE INSTALLATION INSTRUCTIONS #4 & # 3 THEN CONTINUE
WITH INSTRUCTIONS 1, 2 & 3 BELOW.
REMOVE THE (2) 10-32 SHOULDER BOLTS WITH SPRINGS THAT SECURE
THE CAM HOLDER ASSEMBLY, NOTE THE DIRECTION OF THE LOCATING
PIN BEFORE STARTING.
ROTATE THE CAM HOLDER ASSEMBLY 180°.
REINSTALL THE (2) 10-32 SHOULDER BOLTS WITH SPRINGS.
PUSH/PULL LATCHES ARE ASSEMBLED FOR RIGHT HAND AND LEFT HAND DOORS. BE SURE CORRECT SIDE
MATCHES DOOR APPLICATION.
PLACE LATCH BOLT UNIT IN DOOR MAKING SURE BOLT BEVEL FACES DIRECTION OF DOOR CLOSING.
ATTACH FRONT WITH TWO (2) #8 OR 8-32 SCREWS DEPENDING ON DOOR.
POSITION LEVER ASSEMBLIES SO THAT LOCATING PIN AND CAM ARM ENTER INTO CORRESPONDING HOLES
IN LATCH BOLT UNIT. ATTACH LEVER ASSEMBLIES BY THRU BOLTING ONTO DOOR WITH FOUR (4) #10-32 X
2-1/4" PHILLIPS PAN HD. M.S. AND FOUR (4) #10-32 KEP NUTS. FOR PURPOSE OF ALIGNMENT DO NOT
TIGHTEN SCREWS UNTIL ALL FOUR (4) SCREWS HAVE BEEN STARTED.
APPLY COVERS AND FASTEN WITH (2) 8-32 X 3/8" FLAT HD. M.S. FOR EACH COVER.
INSERT DUST BOX IN FRAME MORTISE AND ATTACH STRIKE WITH TWO (2) #8 OR 8-32 SCREWS.
3.
2.
TO CHANGE DIRECTION OF PUSH OR PULL HANDLE
INSTALLATION INSTRUCTIONS
1.
5.
4.
2.
3.
1.
6800 LOW PROFILE PUSH/PULL LATCH
(4) 10-32 X 2-1/4 "
(2) #8 OR 8-32 SCREWS
PHILLIPS FLAT HD. M.S.
BEVEL FACES THE
DIRECTION OF DOOR
MAKE CERTAIN BOLT
CLOSING
(2) PER COVER
(2) 8-32 X 3/8"
DOOR PREPARATION
TYPICAL FINISHED
SQUARE
(4) 10-32 KEP NUTS
PULL SIDE
LOCATING PIN GUIDE
LATCH BOLT UNIT
PUSH SIDE
LISTED
L
U
PATENT PENDING
LOCATING PIN
CAM HOLDER
10-32 SHOULDER BOLTS
WITH SPRINGS
-OR-
ROUND
COVER