7 Operation
ABICOOLER 1300
7 Operation
► Switch the device on and off with the ON/OFF switch.
7.1 Prior to initial commissioning and after a longer standstill
1
Bleed the device and cable assembly.
6.2.1 Bleed the device on page EN
6.2.2 Bleeding the cable assembly on page EN
2
Check the tightness of the coolant connections.
8 Decommissioning
► Observe the documentation for the welding components.
4
Guide the flow control with the line ends through the opening.
5
Pull the heat-shrinking tube over both line ends and connect the
button line to the flow control.
6
Warm the heat-shrinking tube and insulate the connection
point.
7
Place the lines in the connection housing and assemble the
connection housing.
8
Insert the flow control's plug in the connection on the device.
1
Switch off the device.
2
Pull out the mains plug to disconnect from the power supply.