12
Step 9
Attached
Meter (16)
to
Handlebar (6)
and lock by using
Cross pan head bolt M5*10 (61).
Step 10
Connect the wiring of
Sensor (18)
with
Meter wire (16a).
Step 11
Unlock the
Bolt M10*20 (D)
from
Rail Tube (2)
and then lock the
Adjustment knob (50)
.
Adjust the height by using
Adjustment knob (50)
to A, B, C position.
16a
A
B
C
D