As a matter of principle, the electrical supply cable in the domestic power distribution must be switched off for the
entire duration of mechanical and electrical installation. The connection to the power grid must only be made live for
the purpose of commissioning after electrical installation is complete (see
Step 16
in section “Mechanical installa-
tion of the wallbox on the mounting plate” on page 23).
Proceed as follows:
1
Cut crosswise into the marks for the fixing points
on the drilling template using the utility knife.
y
If necessary, you can also use the cutter to cut
out the central opening for the supply cable.
2
Align the drilling template vertically and horizon-
tally on the wall with the spirit level and mark the
fixing points with the pencil.
3
Pre-drill the marked fixing points with the electric
drill and drill bit.
4
Drive the wall plugs into the pre-drilled fixing points
(with a hammer if necessary).