background image

 

 

 

PROBOIL 2 to PROBOIL.2X Upgrade Installation Guide v1b 

 

1.1.4

 

Sensible fire safety precautions: 

⚠ 

Do not store or use petrol or other flammable rags, paper, aerosols, vapours or liquids in the 

vicinity of this or any other appliance.

 

⚠ 

Install the unit on a heat-resistant surface. Make sure that the installation surface is firm and 

level.

 

⚠ 

For safety regulations the plug or means of disconnection must always be accessible after 

installation. 

 

⚠ 

Do not use any water jet or steam near this appliance.

 

⚠ 

Always ensure an airgap of at least 10mm around the appliance and that any closed cabinet has 

sufficient airflow. 

2.1

2.1

2.1

2.1

 

Installation:

Installation:

Installation:

Installation:    

 

2.1.1

 

Installation preparation 

 

Throughout this guide, the following symbols are used to highlight key points or safety considerations.

 

 An information point or tip for 

installation or usage. 

 A service, maintenance 

or care consideration. 

 A technical or safety 

consideration or warning of 

hazardous situation with regard to 

life and property. 

 

  

Preparing yourself to install your replacement PROBOIL2X boiler is simple and ensures the process is 

both quick and safe. The process is very similar to the descaling and cleaning maintenance process in your 
user guide and requires no specialist tools or knowledge other than this guide. 

 

Before installing your replacement boiler please unpack it and check for any missing parts or transport 

damage, in case of an issue please contact the service number on top of the boiler.

 

 

Whilst installing your replacement boiler please check if the filter is also due to be replaced. 

 

You might find it helpful to photograph the installation before your remove the old boiler as a 

memory aid. 

 

Summary of Contents for Pronteau PROBOIL2

Page 1: ...www proboil co uk See top of boiler unit for contact details Please read these instructions carefully before installation We have a policy of continued product and quality development and improvement...

Page 2: ...proboil2x boilers like for like if any modifications are to be made please refer to the complete user and installer guide supplied originally with the product WARNING All surfaces especially those mad...

Page 3: ...place any water connections directly near or above electrical appliances or connections WARNING This appliance is not intended to be operated by means of an external time or separate remote control s...

Page 4: ...bols are used to highlight key points or safety considerations An information point or tip for installation or usage A service maintenance or care consideration A technical or safety consideration or...

Page 5: ...uding non return valve 1 B2 15mm olive B3 15mm nut B4 15mm pipe B5 15mm isolation valve B6 Domestic hot flexible hose excluding non return valve C1 Cold out to filter boiler flexible hose including se...

Page 6: ...nit Drain fully into a suitable container or sink 6 Once drained close the unit and place the boiler to one side EITHER Bypass the existing Proboil 2 black tundish assembly This is the preferred optio...

Page 7: ...cription Drawing A PROBOIL 2X boiler unit B male boiler inlet with internal check valve C 3 8 male boiler outlet D mains power cable E flexible blue inlet pipe F x inlet pushfit connector G blue Inlet...

Page 8: ...wingnut inlet connector with integral internal flat rubber seal G hand tight do not use a spanner or overtighten on to the boiler inlet male B 3 Check that the red 3 8 x 8mm boiler outlet connector J...

Page 9: ...be too short pipe is stretched c Not be twisted or kinked when attached creating a blockage 10 Your boiler is now plumbed to the tap and the filter plug the power cord into the mains outlet but do not...

Page 10: ...he flushing period check all connections made during the installation carefully for leaks 2 After the flushing period is completed turn off close fully the 98 C water handle 3 Press and hold the key o...

Reviews: