  Electrical installation 

  Caution ! Risk of electric shock ! 

 Make sure the AC breaker or switch installed between the         

PV Inverter and the grid (AC Utility). 

Note

Please use Ue: 690Vac / Ie:25A    circuit breaker. 

 Make sure the DC breaker or switch installed between the         

PV Inverter and the PV array. 

Note

Please use Ue: 1000Vdc / Ie:25A    circuit breaker. 

 When working on the PV inverter, disconnect the AC breaker or 

switch and DC breaker or switch. 

 Make sure that the AC breaker or switch and DC breaker or 

switch cannot be unintentionally closed during installation and 

commissioning works. 

The electrical connections for the PV inverter are shown in Figure 1. 

 

Figure 1

 

 

15 

4.4.1

4.4.1

4.4.1

4.4.1

  Connecting to the grid (AC utility) 

  Caution: 

Before connecting to Grid(AC utility),please install a separate 

circuit breaker between inverter and Grid 

 

 

To connect the AC power cable proceed as follows: 

Step 1. Measure the grid’s (i.e., the utility’s) voltage and frequency. The voltage 

and frequency of the inverter are set at the factory to match the utility in 

the country where the product will be delivered. 

Step 2 .Before wiring the PV inverter ensure that the main breaker in the primary 

utility breaker box is switched OFF. Switch this breaker ON only after all 

wiring is completed as instructed below.

 

Step  3  .Remove  the  screws  that  secure  the  wire  terminal  cover,  and  carefully 

remove  the  cover.  Alternatively,  remove  the  connector  as  shown  in

 

Figure 2. 

   

 

Figure 2 

 

 

Summary of Contents for EnerSolis ES 12000

Page 1: ...ng 8 4 2 Installation requirements 9 4 3 Mounting the unit 11 4 4 Electrical installation 14 5 Front display panel 21 6 Starting the inverter 23 6 1 Start up and operation test 23 6 2 Checking values...

Page 2: ...tructions for the ES 6000 ES 8000 ES 10000 ES 12000 that must be followed during installation and maintenance of the inverter Housing Only qualified installers are authorized to open the connection ar...

Page 3: ...voltage when temperature is low and sunlight level remains unchanged At 4 F 20 C the open circuit voltage of the PV modules must never exceed 1 000 V The data sheet of the solar module will include th...

Page 4: ...External features 1 LCD and LED display Shows operation information and status 2 Solar array input plug and play connectors for the solar modules 3 Standard communication ports EPO RS 232 and RS 485...

Page 5: ...oning paper 9 4 2 4 2 4 2 4 2 Installation requirements The PV inverter is heavy Take this weight into account when choosing the installation site and method of installation To ensure proper operation...

Page 6: ...nstallation site ensure that there is enough space for heat dissipation Under normal conditions the following clearance guidelines should be applied 11 4 3 4 3 4 3 4 3 Mounting the unit For vertical i...

Page 7: ...kplane on the wall Step 2 Screw the nut on the sleeve without fastening Step 3 Hang the PV inverter on the backplane Make sure that it holds the inverter unit firm and securelyFinally fastening the nu...

Page 8: ...PV inverter are shown in Figure 1 Figure 1 15 4 4 1 4 4 1 4 4 1 4 4 1 Connecting to the grid AC utility Caution Before connecting to Grid AC utility please install a separate circuit breaker between...

Page 9: ...earthed before operating the PV inverter Suggested AC cable width Model Area mm 2 AWG no ES 6000 2 1 14 ES 8000 2 1 14 ES 10000 3 5 12 ES 12000 3 5 12 17 4 4 2 4 4 2 4 4 2 4 4 2 Status identification...

Page 10: ...00 VDC under any conditions Voltage over 1 000 VDC will damage the inverter 2 Do not exceed the maximum array short circuit current rating marked on the inverter 3 To harvest maximum energy from your...

Page 11: ...panels in String A need not equal the number in String B For a single PV string enter settings mode and configure for parallel operation 21 5 Front display panel Symbols on the LCD 1 LCD Symbol Descri...

Page 12: ...rted ensure the following The wire terminal cover is securely screwed on The AC breaker is OFF The DC cables PV strings are fully connected The AC utility cable is connected correctly 6 1 6 1 6 1 6 1...

Page 13: ...ll still flash 6 1 5 6 1 5 6 1 5 6 1 5 After ten seconds if the inverter s AC soft start is successful the LCD will display drawing E 25 F 6 1 6 6 1 6 6 1 6 6 1 6 If the inverter encounters a problem...

Page 14: ...7 Output voltage A of the inverter utility voltage I J K L M 27 6 2 8 6 2 8 6 2 8 6 2 8 Output voltage B of the inverter utility voltage 6 2 9 6 2 9 6 2 9 6 2 9 Output voltage C of the inverter utilit...

Page 15: ...ter is working normally Whenever the PV array voltage is within range 300 1 000 VDC the PV inverter passes power to the grid as generated by the PV array In normal mode the green LED shines to indicat...

Page 16: ...ured as follows Baud Rate 9600 bps Data Length 8 bits Stop Bit 1 Parity None Pin 2 RS 232 Rx Pin 3 RS 232 Tx Pin 5 Ground 1 2 3 4 5 6 7 8 9 31 RS 485 pin assignments are as follows PIN 3 485 GND PIN 4...

Page 17: ...e that the AC breaker or switch cannot be unintentionally closed during installation and commissioning works Unscrew the two screws and remove the cover Insert the communication card into the slot 33...

Page 18: ...DCE B card 7 2 4 1 7 2 4 1 7 2 4 1 7 2 4 1 Pin assignments of the 10 pin terminal 1 2 3 4 5 6 7 8 Pin 1 Utility voltage is abnormal Pin 2 PV array voltage is normal Pin 3 PV array voltage is abnormal...

Page 19: ...motely Communication 8 1 8 1 8 1 8 1 Grid PV Inverter is equipped with power remotely communication interface and options User can use software to monitor the status of inverter with PC with the follo...

Page 20: ...ror code keeps recurring contact your local distributor Er09 Inverter output over current Over current on the AC side This fault code is displayed if the current in the AC network is larger than speci...

Page 21: ...tributor for help AL11 Isolation fault The impedance between PV and PV and ground is less than 1 M 1 Disconnect ALL PV and PV cables 2 Check the impedance between PV and PV and ground The impedance mu...

Page 22: ...olation fault Islanding operation detection Passive Voltage phase jump detection Active Reactive power control Over temperature Downgraded output power Certification On Grid Performance VDE 0126 1 1 V...

Reviews: