background image

7/8 - Safety instruc

ti

 ons and user guide for automa

ti

 c pool covers

Guarantee form

The o

  cial guarantee is in the sla

tt

 ed cover's container with the commissioning documents. This guarantee must be returned to the 

address below within eight days of the commissioning of the product.

It gives the right to an extension of the guarantee for the Abriblue sla

tt

  ed cover motors to three years as from 

the commissioning date.

User details 

Name:  

 ...............................................................................

Address:    ...............................................................................

  

...............................................................................

Postcode/Town 

e/Town 

 .........

e/Town

...............

..

..........

 .....

.

.

....

..

....

.....

....

 ...............................................

Installer details 

Company:    ...............................................................................

Address:    ...............................................................................

  

...............................................................................

Postcode/Town 

e/Town

:    .........

e/Town

...............

..

..........

 .....

.

.

....

..

....

.....

....

 ...............................................

Comments/Observa

ti

 ons:  ..................................................................................................................................................................................................

.............................................................................................................................................................................................................................................

.............................................................................................................................................................................................................................................

.............................................................................................................................................................................................................................................

AS Pool

Telephone

+33 (0) 811 901 331

postal address

ZAC la Rouvelière - 72 700 Spay - FRANCE

Fax

+33 (0) 243 479 850

Installed model

Serial No. _____ / _____ /_____

Sla

tt

 ed cover type

Sla

tt

 ed cover slat colour

 MANU
 OPEN One
 OPEN Classic
 OPEN SURF System
 OPEN Solar Energy

 BANC Classic
 BANC SURF System 
 BANC Solar Energy
 IMM'Box
 VEESIO

 No Stress
 IMM'Ax
 IMM'Ax Solar Energy
 DIVER

 White PVC 
 Sand PVC
 Blue PVC
 Grey PVC
 Marbled Blue PVC

 Transparent polycarbonate
 Blue-

ti

 nted polycarbonate

 Blue-

ti

 nted two-ply polycarbonate

 Silver two-ply polycarbonate

Signature and stamp (mandatory)

(write the words

"read and approved")

MANDATORY INFORMATION FOR VALIDATION OF THE GUARANTEE

Checks carried out on commissioning by the installer  

Checks carried out by: 

 .................................................................................................................

Yes

No

Checks carried out by: 

Installa

ti

 on carried out in compliance with the standards in force according 

to the manufacturer's instruc

ti

 ons: 

24 volt voltage (sla

tt

 ed covers):

Presence of an automa

ti

 c water level regulator (sla

tt

 ed cover): 

Presence of an independent over

fl

 ow:

Rolling opera

ti

 on (sla

tt

 ed cover):

Unrolling opera

ti

 on (sla

tt

 ed cover):

Locking of the pool cover (sla

tt

 ed cover):

Installa

ti

 on without reserves:

Commissioning date: 

 ...................................................................................................................

Safety, usage, upkeep and maintenance advice explained and sent to the 

responsible user:

Summary of Contents for OPEN Classic

Page 1: ...OMATIC SAFETY COVER OPEN Classic Installation instructions Please read carefully and keep for subsequent consultation Version 02 2013 AE 12 004 4GB 05 2014 S l a t t e d cove r s co m pli a n t Standa...

Page 2: ...POOL ABRIBLUE with over 55 000 automatic covers since 1995 The advice will allow the user to make the best use of this product which should give compete satisfaction to its users Compliant with the hi...

Page 3: ...ll dimensions of the pool cover 10 4 Electric connections 4 1 Box 11 4 2 Motor and key switch 11 4 3 Roller rotation test 11 4 4 Uncoupling 11 5 Assembling the slats 5 1 Placing the slats on the water...

Page 4: ...and using 2 x 6 mm if the cable is between 15 m and 30 m long 1 1 4 Water treatment communication option Plan a connection between the box and the roller using 2 x 1 5 mm if you are installing the com...

Page 5: ...uaring checks Fig 5 1 3 1 In order to correctly place your roller perpendicular to the pool lengths measure the diagonals 1 3 2 Make a mark 1 on the pool liner at the level of the edge opposite the ca...

Page 6: ...registered letter with acknowledgement of receipt to the transporter within 2 days This letter must give an exact description of the damage Send a copy of the letter to AS POOL for information 2 2 3 S...

Page 7: ...ide by inserting the motor end into the white shaft bearing taking care to place the motor cable exit towards the ground and the end of run adjustment screws towards the sky 3 2 3 Pin the motor end to...

Page 8: ...n the line formed by 1 and 3 see Fig 2 and Fig 5 3 3 2 Fig 13 Measure the distance between the posts and use it to place the plates on the ground and make marks for the drilling 3 4 Preparing the fixt...

Page 9: ...2 Inject a dose of one sealing graduation into each drilled hole and place the threaded rods as you go 3 7 3 Respect the drying time indicated on the cartridge 3 8 Cutting the pool copings Fig 18 and...

Page 10: ...s and the M8 nuts 3 9 2 Fig 16 Adjust the verticality of the posts and the horizontality of the tube using the lower nuts 3 9 3 Fig 20 Tighten using a torque wrench set at 40 Nm 3 10 Final overall dim...

Page 11: ...4 4 3 Roller rotation test Fig 23 4 3 1 Switch on the box and test the tube s rotation in both directions The slats roll by passing over the shaft If the movement does not correspond to the correct di...

Page 12: ...er anti lifting mechanisms on the side opposite the roller and the slats for the stairs 5 2 Assembling the slats Fig 25 5 2 1 Assemble the slats by clipping them together by inserting the double male...

Page 13: ...rder to leave the space for the cap on the base stair slat 5 6 Slat orientation ski Fig 29 So that the slats unroll towards the opposite side of the pool place the orientation ski on the lower face of...

Page 14: ...oller 5 8 Fixing the anti lifting buckles 5 8 1 Fig 31 33 Fix the female loops on the sides 40 mm above the water line opposite the anti lifting mechanisms pre installed on the slats 5 8 2 Fig 32 34 O...

Page 15: ...Fix the part 2 using the TRHC M5x30 mm screws and M5 brass plugs Make sure that this is horizontally level Fix the face on the part 2 using the TRPZ 4x16 mm screws 5 9 3 Fig 37 Option for fixing the...

Page 16: ...art of the last slat 5 9 9 Fig 43 In the case of trapeze or roman stairs a strap is provided instead of the harpoon in the sloped or rounded areas Therefore you need to Unclick the two slats in the pl...

Page 17: ...lats and then fix the straps between the black 30 x 80 fixtures by tightening the screws Check that the gaps around the cover in the pool are evenly spaced on either side as soon as the rolling starts...

Page 18: ...s diagonally opposite 7 1 8 Thermal circuit breaker test 24 V DC on the terminals marked and at the connecting cable connections 7 1 9 If a voltage is not present or a value is di erent check again ma...

Page 19: ...connect wire 4 to the and wire 3 to the The direction of polarity is important 7 4 4 Place wire 1 in contact with wire 4 24 V the motor should turn in the other direction 7 4 5 Remove wire 1 7 4 6 Pl...

Page 20: ...installation the reception of the documents for the cover and the information given to the end user 8 Checks Check the following points relating to standard NF P 90 308 and check that the cover opera...

Page 21: ...ABRIBLUE LINE Safety instructions and user guide for automatic pool covers Please read carefully and keep available for later use Version 02 2013 AE 012 138 3GB 05 2014 Slatted covers...

Page 22: ...danger to your children Drowning happens very quickly Children close to a pool require constant monitoring and active supervision even if they can swim The physical presence of a responsible adult is...

Page 23: ...pots by handling the wheel with both hands It is imperative during rolling or unrolling operations not to release the key until the end of run stops have been reached especially on the BANCS in order...

Page 24: ...er level regulation overflow not clogged automatic filling correctly set Make sure that the area where the cover motor is located is fitted with a drain preventing the motor from being immersed at all...

Page 25: ...ol owners Have the automatic cover serviced by a swimming pool professional we recommend your swimming pool installer whose details are on the cover of this manual who will be able to contact our tech...

Page 26: ...he batteries must be disconnected and stored in a dry place When putting back into service let the batteries charge a half day of sunlight before operating the cover 6 Guarantee Our one year guarantee...

Page 27: ...EN Solar Energy BANC Classic BANC SURF System BANC Solar Energy IMM Box VEESIO No Stress IMM Ax IMM Ax Solar Energy DIVER White PVC Sand PVC Blue PVC Grey PVC Marbled Blue PVC Transparent polycarbonat...

Page 28: ...c box check the 10A 30mA ground fault circuit breaker The on o button on the box is ON Fuses are in good condition 24 V DC voltage on the motor power terminals when the key is turned Continuity of con...

Reviews: