12
ASSEMBLY
1. Insert the Upper Front Shroud (#21) at the top of the Main Frame (#1) by sliding it
into the two grooves on either side of the frame. Slide the Upper Front Shroud (#21)
all the way down until the top of the shroud is flush with top of the groves on the Main
Frame (#1), then feed the cable through the access hole at the top of the shroud.
STEP 4