background image

Absco Industries

Assembly Instruction Manual

ABSCO SPACE SAVER SHED

MODEL: 15151SK

1.52mW x 1.52mD x 1.80mH, 2.08mH

Model: 15151SK

14/08/18

1.2

20  

 

 

Australia Product Warranty Against Defects

•  Absco Sheds, including garden sheds, garden beds, aviaries, storage units, garages, awnings and carports 

are made using high quality Australian made steel.

•  We are pleased to advise we warrant that the steel coating will not rust, crack, fl ake peel or blister for 30 

years from date of purchase, when installed within Australia.

•  This warranty does not apply to surface deterioration of panels caused by ‘Swarf” (Tiny particles of 

steel debris left from cutting, grinding or drilling operations) that has not been removed after building 
construction, or as a result of contact with damp soil, chemicals, fertilisers or other corrosive substances. 

•  This warranty covers any Absco product used for normal domestic use and installed in accordance with the 

installation instructions. 

•  The warranty does NOT cover Damage caused by storms, wind, rain snow or poor foundations. 

•  This warranty does NOT cover ABSCO products installed in severe coastal, industrial or other highly 

corrosive environments. The warranty does not cover fasteners (screws, nuts, bolts, rivets, hasps or sliding 
padbolts).

•  The warranty is limited to replacement and delivery of components and does not include any labour or 

installation costs. The benefi ts given by the warranty are in addition to your other rights and remedies 
under a law in relation to the goods or services to which the warranty relates.

•  The warranty applies to the exclusion of all other representations, guarantees or warranties express or 

implied, our goods come with guarantees that cannot be excluded under the Australian consumer law and 
is not transferable. You are entitled to a replacement or refund for a major failure and for compensation 
for any other foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if 
the goods fail to be of an acceptable quality and the failure does not amount to a major failure. For further 
information go to http://www.consumerlaw.gov.au

•  Please retain a proof of purchase (sales docket or invoice) or register your warranty within 30 days of 

purchase here: www.absco.com.au/register_warranty.php

•  In the unlikely event a warranty claim is made, it must be supported by photographic evidence and details 

of the defect, including component part numbers, together with proof of purchase documentation (or 
on-line registration of purchase) and forwarded to the address below. Upon receipt of the warranty claim, 
the Customer Service Manager will contact you within three business days to advise you of the assessment 
outcome of the claim, which may include your expenses incurred in making the claim.

THE CUSTOMER SERVICE MANAGER, ABSCO INDUSTRIES, PO BOX 119 ACACIA RIDGE QLD AUSTRALIA 4110

PHONE

: 1800 029 701 

FAX

: 07 3344 1191 

EMAIL

: warranty@absco.com.au

Issued 01 January 2018

Summary of Contents for 15151SK

Page 1: ...videos At ABSCO Industries we are always looking to be number ONE so please let us know what you think of our instructions Feedback makes us better feedback absco com au CONCRETE REBATED EDGE BOTTOM CHANNEL CONCRETE SLAB 75mm WIDE REBATE 100mm WHEN LAYING YOUR CONCRETE SLAB ENSURE THERE IS A REBATED EDGE 25mm DEEP AROUND THE PERIMETER THIS WILL HELP WATER EGRESS FROM THE BASE OF THE SHED Absco Ind...

Page 2: ...ite for the shed must be level An uneven surface may result in misalignment of parts The shed shall be erected on top of a reinforced concrete slab and anchored down appropriately illustrated on FINAL CONSTRUCTION page TOOLS REQUIRED SAFETY NOTES Some parts may have sharp edges It is advisable to wear gloves when handling these items and safety glasses if drilling holes Sensible shoes are highly r...

Page 3: ...EL SHEET 1725mm X 773mm B 1 4 1 2 1 2 1 1 53A CHANNEL L 1513mm 1 53B CHANNEL L 1513mm 53C CHANNEL L 1513mm CHANNEL L 1513mm 81F 1 CHANNEL L 1513mm 81E 80A CHANNEL L 1785mm 79C CHANNEL L 783mm 2 1 1 1 2045 X 773mm 262 STEEL SHEET STEEL SHEET 1915mm X 773mm 260L STEEL SHEET 1915mm X 773mm 260C STEEL SHEET 2045mm X 773mm 261L STEEL SHEET 2045mm X 773mm 261R STEEL SHEET 1610mm X 773mm 43S STEEL SHEET ...

Page 4: ...L 773mm 89B JAMB L 1785mm 1 1 ASSEMBLY INSTRUCTIONS 12A 1 DOOR STRAP L 165mm 90C JAMB L 783mm 88J LIP TRIM L 1610mm 2 58A 58B 58C 88J Part No Here 54H Part No Here 54H Part No Here 54H Part No Here 1 PSTKSGL SINGLE DOOR FITTINGS PACK DOOR PADBOLT HASP 1 1 SELF TAPPING SCREWS PACKET CONTAINING 220 1 DOOR PADBOLT FAST006 3 16 COUNTERSUNK SCREWS NUTS 6 3 2 x 8mm BLIND POP RIVETS 6 PSTKSGL SINGLE DOOR...

Page 5: ...tap the channel along the sheets until each end is neatly flush If you need to remove channels from the panels slide it off from the side Channel locks the shed panel into position without the need for screws FASTENING SYMBOLS Secure channel to sheeting by SNAPTiTE fastening method Join components together with one screw at this location only as some channels have extra holes that are not required ...

Page 6: ...stries Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 15151SK 1 52mW x 1 52mD x 1 80mH 2 08mH Model 15151SK 14 08 18 1 2 6 OVERVIEW OF ROOF COMPONENTS OVERVIEW OF ROOF COMPONENTS 81E 88J 43S 81E 88J 43S ...

Page 7: ...ABSCO SPACE SAVER SHED MODEL 15151SK 1 52mW x 1 52mD x 1 80mH 2 08mH Model 15151SK 14 08 18 1 2 7 OVERVIEW OF WALL COMPONENTS OVERVIEW OF WALL COMPONENTS 261R 260C 34A B 260L 261L 262 262 91A 89B 89A 79C 53B 81E 81F 80A 61D 53C 61D 53A 81E 90C 22A ...

Page 8: ... Industries Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 15151SK 1 52mW x 1 52mD x 1 80mH 2 08mH Model 15151SK 14 08 18 1 2 8 REAR PANEL ASSEMBLY 1x required 262 262 SNAPT TE i 53C SNAPT TE i 81F ...

Page 9: ...ssembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 15151SK 1 52mW x 1 52mD x 1 80mH 2 08mH Model 15151SK 14 08 18 1 2 9 SIDE PANEL ASSEMBLY With door mullion 80A attached 261R 260C 80A 81E 61D SNAPT TE i SNAPT TE i ...

Page 10: ...tries Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 15151SK 1 52mW x 1 52mD x 1 80mH 2 08mH Model 15151SK 14 08 18 1 2 10 SIDE PANEL ASSEMBLY Without door mullion 81E 61D SNAPT TE i SNAPT TE i 260L 261L ...

Page 11: ...o Industries Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 15151SK 1 52mW x 1 52mD x 1 80mH 2 08mH Model 15151SK 14 08 18 1 2 11 ROOF PANEL ASSEMBLY SNAPT TE i 81E 88J 81E 88J SNAPT TE i 43S 43S ...

Page 12: ... SPACE SAVER SHED MODEL 15151SK 1 52mW x 1 52mD x 1 80mH 2 08mH Model 15151SK 14 08 18 1 2 12 FRONT PANEL ASSEMBLY SNAPT TE i SNAPT TE i 34A 89A 53B 53A 79C 89B 90C 90C 53A 89A 89A 53A 90C 89A 53A 90C 89B 89B 53A 90C 79C 53B 89B 89B 53B 79C 79C 53B 89B ...

Page 13: ... 1 52mD x 1 80mH 2 08mH Model 15151SK 14 08 18 1 2 13 DOOR PANEL ASSEMBLY Vertical door channels are installed in the opposite orientation compared to the horizontal door channels Short flange of channel Long flange of channel SINGLE DOOR 58C 58C SNAP T TE i SNAP T TE i 12A B B 58B 58A D D D D ...

Page 14: ...DOOR PANEL NOTE Nuts and bolts are also supplied and may be used instead of rivets Use a 4mm drill bit to enlarge these holes in the jamb NOTE The holes to fasten the padbolt hasp are not pre punched to allow for proper alignment Position the hasp centrally over the padbolt shaft and drill 3mm holes and secure with screws 91A 91A DOOR PANEL ASSEMBLY B ...

Page 15: ...TE Take care to ensure that all wall panels are not upside down The top channels of each panel are pre punched for attaching roof sheeting The base channels are not pre punched Side wall channels fit into the notched rear wall channels Connect door mullion sections with six 20mm screws Replace padbolt hasp 10mm screws with 20mm screws 260C 80A 89B D D D D D D D D D ...

Page 16: ...ON Each anchor consists of one nut bolt M10 dynabolt and steel angle Drill a 10mm hole into the wall sheet Drill a 10mm hole into the concrete Bolt and Nut M10 4 6 S Steel Angle 35 x 35 x 3 M10 Dynabolt Denotes hot dip galvanised finish Wall Sheet Slab Location of 9 concrete anchors 250 250 250 250 250 250 510 480 510 250 ANCHORING OF SHED D D D D D D D D D D ...

Page 17: ... the installation contractor Scaling of drawings shall not be undertaken 7 G Prior to commencing works on site the contractor shall verify the position of all services in the area to ensure that the construction does not interfere with any of those services 8 G During installation on site the shed structures shall be maintained in a stable condition with no part becoming overstressed or permanentl...

Page 18: ...the relevant provisions of AS1562 Steelwork 1 F The supporting slab foundation for the garden shed shall be of a minimum size indicated on the installation manual The top surface of the formed slab shall be level and free of any irregularities which would inhibit the installation of the shed 2 F The structural engineering design for the supporting slab foundation shall be undertaken by a suitably ...

Page 19: ... wheelbarrows garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and or stacked above the concrete floor on timber slats Waterproof sealants may be used to offer further protection where required around joins and screw fixings as can rubber door seals and other products wh...

Page 20: ...sts The benefits given by the warranty are in addition to your other rights and remedies under a law in relation to the goods or services to which the warranty relates The warranty applies to the exclusion of all other representations guarantees or warranties express or implied our goods come with guarantees that cannot be excluded under the Australian consumer law and is not transferable You are ...

Reviews: