background image

Absco Industries

Assembly Instruction Manual

ABSCO REGENT SHED

MODEL: 23141RK

2.26mW x 1.44mD x 1.96mH

Model: 23141RK

2/03/21

1.1

1  

 

 

DOWNLOAD

 

OUR APP FOR

ASSEMBLY

VIDEOS

LEAVE A REVIEW

Tell us about your experience and 

receive a $20 Coles Gift Card.

Visit

 

www.abscosheds.com.au/review

AU: 1800 029 701

NZ: 0800 466 444

admin@absco.com.au

www.abscosheds.com.au

2360mm

154

0m

m

CONCRETE

 

SLAB

When laying concrete slab, ensure there 
is a rebated edge 25mm deep around 
the perimeter. This will help water egress 
from the base of the shed.

For construction in non-cyclonic areas

Wind rating: N2 as per AS4055-2012.
If you require a higher wind rating please contact 
us: admin@absco.com.au or 1800 029 701

ABSCO INDUSTRIES

ASSEMBLY INSTRUCTION MANUAL

SHED MODEL: 23151GK 

21-11-2017  

      

CONCRETE SLAB

2360mm

1620mm

FRONT:   2.26m

SIDE:       1.52m

HEIGHT:  1.95m

We thank you for choosing an Australian made

shed. For further assistance please visit our detailed

instructional video library at

Http://www.abscosheds.com.au/watch-videos

At ABSCO Industries we are always looking to be

number ONE, so please let us know what you think

of our instructions. Feedback makes us better.

feedback@absco.com.au

CONCRETE 

REBATED EDGE

BOTTOM CHANNEL

CONCRETE SLAB

75mm WIDE REBATE

100mm

WHEN LAYING YOUR CONCRETE

SLAB, ENSURE THERE IS A

REBATED EDGE 25mm DEEP

AROUND THE PERIMETER

THIS WILL HELP WATER EGRESS

FROM THE BASE OF THE SHED

Absco Industries

Premier Shed Model: 23151GK

PAGE 01

Summary of Contents for 23141RK

Page 1: ...higher wind rating please contact us admin absco com au or 1800 029 701 ABSCO INDUSTRIES ASSEMBLY INSTRUCTION MANUAL SHED MODEL 23151GK 21 11 2017 CONCRETE SLAB 2360mm 1620mm FRONT 2 26m SIDE 1 52m HEIGHT 1 95m We thank you for choosing an Australian made shed For further assistance please visit our detailed instructional video library at Http www abscosheds com au watch videos At ABSCO Industries...

Page 2: ... the shed must be level An uneven surface may result in misalignment of parts The shed shall be erected on top of a reinforced concrete slab and anchored down appropriately illustrated on FINAL CONSTRUCTION page TOOLS REQUIRED SAFETY NOTES Some parts may have sharp edges It is advisable to wear gloves when handling these items and safety glasses if drilling holes Sensible shoes are highly recommen...

Page 3: ...ART No CHECK COMPONENT DESCRIPTION PART No CHECK QTY QTY 2 1 2 6 1 30A STEEL SHEET 1785mm X 773mm 31A 32A B 48L 2 STEEL SHEET 1170mm X 773mm 48R 2 GABLE L H L 1105mm 17L 2 GABLE R H L 1105mm 17R 2 13B BRACE L 350mm 1 97C RIDGE BEAM L 1513mm STEEL SHEET 1785mm X 773mm STEEL SHEET 1170mm X 773mm STEEL SHEET 1785mm X 731mm STEEL SHEET 1725mm X 773mm Nominal sheet widths are shown 2mm is within tolera...

Page 4: ...25mm 58B CHANNEL L 1725mm 58C CHANNEL L 773mm 59C CHANNEL L 1439mm 1 CHANNEL L 1513mm 81E 78C CHANNEL L 1513mm 79B CHANNEL L 788mm COMPONENT DESCRIPTION PART No CHECK COMPONENT DESCRIPTION PART No CHECK QTY QTY 1 1 1 76AR CHANNEL L 1126 5mm 54CR CHANNEL L 1126 5mm 1 76BR CHANNEL L 1126 5mm 81DR CHANNEL L 1126 5mm 1 1 1 76AL CHANNEL L 1126 5mm 54CL CHANNEL L 1126 5mm 1 76BL CHANNEL L 1126 5mm 81DL ...

Page 5: ... PACKET 2 1 89A JAMB L 1785mm 91A JAMB L 1120mm 90B JAMB L 788mm 1 89B JAMB L 1785mm 1 86B LIP TRIM L 1170mm CSJ 4 CHANNEL JOINER L 200mm 7 9 DOOR PADBOLT HASP 1 1 SELF TAPPING SCREWS PACKET CONTAINING 220 1 DOOR PADBOLT FAST006 3 16 COUNTERSUNK SCREWS NUTS 6 3 2 x 8mm BLIND POP RIVETS 6 PSTKSGL SINGLE DOOR FITTINGS PACK PACK 6P SCREW PACK 6 PACK 6P SCREW PACK 6 1 PHILLIPS DRIVER BIT 3mm DRILL BIT...

Page 6: ... channel along the sheets until each end is neatly flush If you need to remove channels from the panels slide it off from the side Channel locks the shed panel into position without the need for screws FASTENING SYMBOLS Secure channel to sheeting by SNAPTiTE fastening method Join components together with one screw at this location only as some channels have extra holes that are not required for th...

Page 7: ... the channel where the JOIN text is marked Push down one side of the CSJ until you hear a click Step 3 Join the second channel to the CSJ by positioning the JOIN of the channel at the centre of the CSJ on an angle Push the CSJ into the channel until you hear a click Finished Channel The joined channels should now look like the picture with the CSJ positioned equally inside of the joined channels D...

Page 8: ...ICED CHANNELS NOTE Some channels may have holes in them You will need to redrill holes where CSJ joining channel covers them Join together 8 x channel sections using 4 x channel joiners Part CSJ 2253mm 88 7 1 x 81D 1 x 54C 1 x 76A 1 x 76B 76BL 76BR 76AR 76AL 54CL 54CR 81DL 81DR 1 X 81DR 1 X 81DL 1 X 54CR 1 X 54CL 1 X 76AR 1 X 76AL 1 X 76BR 1 X 76BL ...

Page 9: ...ssembly Instruction Manual ABSCO REGENT SHED MODEL 23141RK 2 26mW x 1 44mD x 1 96mH Model 23141RK 2 03 21 1 1 9 OVERVIEW OF ROOF COMPONENTS OVERVIEW OF ROOF COMPONENTS 48L 48L 48R 48R 86B 14A 86B 97C 78C 81E 86B 86B 81E ...

Page 10: ...O REGENT SHED MODEL 23141RK 2 26mW x 1 44mD x 1 96mH Model 23141RK 2 03 21 1 1 10 OVERVIEW OF WALL COMPONENTS OVERVIEW OF WALL COMPONENTS 32A 32A 30A 31A 13B 30A 32A 32A 32A 32A B 22A 91A 79B 89B 89A 90B 76A 81I 59C 17R 17L 17L 17R 59C 76B 81D 81I 54C ...

Page 11: ...bsco Industries Assembly Instruction Manual ABSCO REGENT SHED MODEL 23141RK 2 26mW x 1 44mD x 1 96mH Model 23141RK 2 03 21 1 1 11 REAR PANEL ASSEMBLY 1x required 30A 31A 30A 76B 81D SNAPT TE i SNAPT TE i ...

Page 12: ...nstruction Manual ABSCO REGENT SHED MODEL 23141RK 2 26mW x 1 44mD x 1 96mH Model 23141RK 2 03 21 1 1 12 ROOF PANEL ASSEMBLY 2x required 48L 48R Fit 81E to edge of sheet with pre punched holes SNAPT TE i SNAPT TE i 86B 81E 86B 78C ...

Page 13: ...o Industries Assembly Instruction Manual ABSCO REGENT SHED MODEL 23141RK 2 26mW x 1 44mD x 1 96mH Model 23141RK 2 03 21 1 1 13 SIDE PANEL ASSEMBLY 2x required Small pan 32A 32A SNAPT TE i SNAPT TE i 59C 81I ...

Page 14: ...sembly Instruction Manual ABSCO REGENT SHED MODEL 23141RK 2 26mW x 1 44mD x 1 96mH Model 23141RK 2 03 21 1 1 14 FRONT PANEL ASSEMBLY 1x required 89B 89A 32A 32A 76A 79B 54C 90B SNAPT TE i SNAPT TE i SNAPT TE i SNAPT TE i ...

Page 15: ... Model 23141RK 2 03 21 1 1 15 DOOR PANEL ASSEMBLY DOOR PANEL ASSEMBLY Vertical door channels are installed in the opposite orientation compared to the horizontal door channels Short flange of channel Long flange of channel SINGLE DOOR 58C 58C SNAP T TE i SNAP T TE i 12A B B 58B 58A D D D D 1x required ...

Page 16: ...NEL NOTE Nuts and bolts are also supplied and may be used instead of rivets Use a 4mm drill bit to enlarge these holes in the jamb NOTE The holes to fasten the padbolt hasp are not pre punched to allow for proper alignment Position the hasp centrally over the padbolt shaft and drill 3mm holes and secure with screws 91A 91A DOOR PANEL ASSEMBLY B ...

Page 17: ...down The top channels of each panel are pre punched for attaching roof sheeting The base channels are not pre punched Pre punched channel to match ridge beam holes Side wall channels fit into the notched rear wall channels Pre punched holes in roof panel to this side for connection to front and rear walls Orient panel so channel 78C goes into ridge beam Channel 81C this end 97C D D D D D D D D D D...

Page 18: ...GS ALL WALL PANELS BY 37mm 13A Secure ridge beam to gable sections with two screws at each end Secure each roof panel with one screw in each corner only at this stage After attaching both roof panels to walls as shown above fit one regent brace to the ridge beam and front wall as shown You will have to remove and replace existing screws at fixing locations Repeat this procedure for the rear wall r...

Page 19: ...le into the wall sheet Drill a 10mm hole into the concrete Bolt and Nut M10 4 6 S Steel Angle 35 x 35 x 3 M10 Dynabolt Denotes hot dip galvanised finish Wall Sheet Slab 14A Bend the top and bottom flanges as shown then hook the bottom flanges under the top channel and screw top to the ridge beam with two screws ANCHORING OF SHED Location of 12 concrete anchors 700 700 430 430 430 430 1000 1000 50 ...

Page 20: ...he installation contractor Scaling of drawings shall not be undertaken 7 G Prior to commencing works on site the contractor shall verify the position of all services in the area to ensure that the construction does not interfere with any of those services 8 G During installation on site the shed structures shall be maintained in a stable condition with no part becoming overstressed or permanently ...

Page 21: ...vant provisions of AS1562 Steelwork 1 F The supporting slab foundation for the garden shed shall be of a minimum size indicated on the installation manual The top surface of the formed slab shall be level and free of any irregularities which would inhibit the installation of the shed 2 F The structural engineering design for the supporting slab foundation shall be undertaken by a suitably qualifie...

Page 22: ...barrows garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and or stacked above the concrete floor on timber slats Waterproof sealants may be used to offer further protection where required around joins and screw fixings as can rubber door seals and other products which a...

Page 23: ...s of claiming warranty To make a claim under the warranty within the warranty period you will need to contact the manufacturer directly by phone or email Contact Number 1800 029 701 Contact Email admin absco com au You will be required to produce proof of purchase this is at discretion of the manufacturer at the time of the claim The manufacturer bears the cost of replacing the products or spare p...

Page 24: ... equipment and should not be used for articles that may be prone to damage if they come into contact with moisture 3 Major Defects If the manufacturer is satisfied that the defect is a major defect the purchase price may be refunded in lieu of providing a replacement product or repairing the product This warranty is provided in addition to other rights and remedies you have under law Our goods come...

Reviews: