background image

Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE GAZEBO

MODEL: ADGAZEBO63

6.12m W x 3.11m D x 2.60m H

Model: ADGAZEBO63

4/12/23

1.00

11  

 

 

0.

 Remove protective plastic coating from 

guttering components.

1. 

Next join both lengths of gutter 

RWG24

, to 

match the overall finished length of the structure.

Notch out the rolled edges (shown in grey) to 
allow one to slide inside the other.

Consider which way you want the water to fall 
before notching. Make sure the ‘uphill’ gutter is 
notched and inside the other.

2. 

Put silicone in the joint and then use two rivets 

FAST102

 per side.

3. 

Take a gutter end stop 

RWG25

 and test fit it 

over an end of the gutter. Mark off the following.

A. 

Midpoint along the top

B. 

Face of gutter shown

4. 

Trim away area shown in grey with tinsnips

5. 

Repeat steps at the other end to make the 

other end stop.

6. 

Attach end caps with a rivet 

FAST102 

through 

the front back and bottom. Joints may be sealed 

using silicone.

7. 

Test fit the assembly

•  Front and rear flashings go inside end caps.

•  Roof panel ‘top skin’ sits under top face of 

end caps.

•  This face will be against the low side beam.

GUTTERING

A

B

4

3

1

5

2

Summary of Contents for ADGAZEBO63

Page 1: ...www abscosheds com au For construction in non cyclonic areas Wind rating N3 as per AS4055 2021 If you require a higher wind rating please contact us admin absco com au or 1800 029 701 NOTE Concrete s...

Page 2: ...detail to gain a thorough understanding of assembly methods and associated details Unpack and carefully identify and check off all the parts against the parts described and illustrated on Components...

Page 3: ...mm 3115 mm Downpipe 80 mm RWG 21 1 QTY CHECK 2925 mm 2680 m m 5680 m m 3045 m m 3140 mm 3105 mm 1 QTY CHECK TU 8 QTY CHECK BK3 1 QTY CHECK 2 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 200 QTY CHEC...

Page 4: ...post 2 Fasten using four FAST100 tek screws and 5 16 nut setter Make sure screws are inset 20 mm from the edges of bracket for beam clearance To keep the parts aligned while fastening use a clamp or...

Page 5: ...f this manual Drill the holes for the anchors using the post baseplate as a template Use a hammer drill with a 12mm diameter masonry drill bit drill to a depth of 100mm Fasten to foundations with four...

Page 6: ...ke sure the ends of the beam are as far as they can go into the brackets there will be a small gap at the high side due to angle Fasten each end with four FAST100 tek screws as before 6 Repeat these s...

Page 7: ...ely trim flush with a Stanley knife B Check if the steel bottom skin corner is bent down below the bottom face Bend it up with pliers C To increase weather protection turn up the pans 15 degrees with...

Page 8: ...t pan 5 On the middle rib fasten to front beam with another tek 14 x 125 mm FAST104 Fixed panel A Overlap rib B Press here Complete Next panel Bottom skin male female features align FRONT VIEW Laying...

Page 9: ...Bent tab hard up against end Top face sits on two sheet ribs Bottom face covers the Z flashing 15 90 o 0 TR36 flashing will overhang roof panel at the rear and we ll need to trim to make the gutter fi...

Page 10: ...the front end of the structure take one TR37 flashing and place over the front flashing and roof panels as shown 2 Take the second TR37 flashing and place alongside butted against the first trim so i...

Page 11: ...uphill gutter is notched and inside the other 2 Put silicone in the joint and then use two rivets FAST102 per side 3 Take a gutter end stop RWG25 and test fit it over an end of the gutter Mark off the...

Page 12: ...point shown 10 Take a string line and make a line from the high to low point 11 Align the bottom of the gutter bracket with the marks and fasten to rear beam using rivets FAST102 Place middle bracket...

Page 13: ...en and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches the unde...

Page 14: ...art 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Design...

Reviews: