Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE PATIO

MODEL: ADPATIO6030

6.12m W x 3.11m D x  up to 3.18m H

Model: ADPATIO6030

21/09/23

1.0

4  

 

 

Existing Soffit

Existing Soffit

Gutter

Gutter

Existing Timber Fascia

Existing Steel Fascia

RECEIVER CHANNEL

0. 

Refer to points 1 to 3 on page 2 before 

beginning this step.

1. 

Mount the first receiver channel 

TR38

 to the 

existing structure using the correct fixing method 

below.

Make sure the receiver channel is oriented with 

the longer side to the top.

A.

 Brickwork

Fix 14 x 45mm Tapcon screw every 450mm (not 

suitable for structures with no eaves or two story 

with blueboard over brick). Ensure a minimum of  

5 courses above the receiver channel.

B.

 Timber fascia

Fix the receiver channel 

TR38

 every 600mm to 

the timber fascia with 12 x 50 Type 17 timber 

screws.

C. 

Steel Fascia

NOTE: This will require roofing to be removed to 

access to rafter.

At every 900mm fit a supplied rafter bracket 

BK5

 

to existing rafter.

Fix this to receiver channel 

TR38

 with a self 

drilling tek or bolt.

Brickwork

Rafter

Existing

Truss

Rafter bracket

Roofing

Roofing

TR38

TR38

TR38

BK5

Summary of Contents for ADPATIO6030

Page 1: ...If you are not capable it is recommended you hire a professional NOTE 2 The existing structure should be checked for its capacity to support and tie down this structure prior to construction by a suit...

Page 2: ...the structure must be left for a period of time uncompleted it must be made safe to prevent damage TOOLS REQUIRED Use as a guide other tools equipment may be suitable Safely work within your ability...

Page 3: ...WG 21 1 QTY CHECK 2925 mm 5680 m m 3045 m m 3140 mm 3052 mm 1 QTY CHECK TU 2 QTY CHECK BK3 1 QTY CHECK 2 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 100 QTY CHECK FAST100 200 QTY CHECK FAST101 200 Q...

Page 4: ...hannel is oriented with the longer side to the top A Brickwork Fix 14 x 45mm Tapcon screw every 450mm not suitable for structures with no eaves or two story with blueboard over brick Ensure a minimum...

Page 5: ...rst and it s straight 3 Mark out the anchoring position for the posts next 4 Place the two post bracket BK4 centred over these marks Drill the hole for the anchor using the post baseplate as a templat...

Page 6: ...imum height 3090 mm do not trim post Instead go to step 3 2 Take a post PT5 and mark all faces then safely cut post to length Consider sealing cut with supplied paint 3 Take a BK3 bracket and orientat...

Page 7: ...over the anchored post bracket Make sure the post is orientated so the top bracket is as shown 7 Use a spirit level check the post is vertical and fasten with four FAST100 tek screws and 5 16 nut sett...

Page 8: ...to the top 1 Remove the protective plastic coating from the outside of the beam 2 Safely lift and place a SB2 beam inside the post brackets BK3 as shown Overlap to top Overlap to bottom INTERIOR EXTER...

Page 9: ...he pans 15 degrees with a turn up down tool or equivalent as shown Familiarizeyourselfwiththeweightandorientation of the AD1 panel before lifting The bottom skin has a protective plastic coating this...

Page 10: ...om skin male and female features 6 Carefully push the panel up so it goes all the way into the receiver channel and is flush along the front beam Just like the 1st panel 7 As before fix the panel to t...

Page 11: ...movethetek14x125mmFAST104 from step 4 and insert the other Z flashing TR35 Trim to length so it finishes flush with the edge of the rightmost panel Refit screw through flashing and into original hole...

Page 12: ...kin end is against the top side of the flashing Then continue 30mm down the side 2 Mark off where the Z flashing is against the bottom side of the flashing Then continue 40mm up the side 3 On the side...

Page 13: ...sure the uphill gutter is notched and inside the other 2 Put silicone in the joint and then use two rivets FAST102 per side 3 Take a gutter end stop RWG25 and test fit it over an end of the gutter Ma...

Page 14: ...e rear beam at the point shown 10 Take a string line and make a line from the high to low point 11 Align the bottom of the gutter bracket with the marks and fasten to rear beam using rivets FAST102 Pl...

Page 15: ...tighten and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches th...

Page 16: ...s Part 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Desi...

Reviews: