Absco Industries
Assembly Instruction Manual
ABSCO GABLE CARPORT
MODEL: GCPDN2
6.0mW x 6.0mD x 2.98mH
Model: GCPDN2
8/06/23
14
Every pan
Every pan
2nd pan
2nd pan
20mm overhang
30 mm overhang min
Option.
On the ground, lay out
the roof sheeting as if they were
on the frame already. Using a
piece of wood, as pictured, turn
up the pans of each sheet at the
end that’s going to be at the
ridge.
This will help prevent rainwater
entering the structure during
windy conditions.
1.
When laying sheets:
• Give first sheet a 20mm
overhang of the end truss
• All sheets will overhang the
edge beam by min 30mm for
the gutters.
2.
Use Hex head tek screw with
neoprene washer
FAST035
at
every pan
to top purlin and edge
beam.
Use one Hex head tek screw
with neoprene washer at
every
second pan
to the middle
purlins.
NOTE: Lift and fasten off a single
sheet at a time, this will mean
you can reach all screw positions
easily from a platform ladder.
Avoid walking on the roof so
sheeting is not damaged. If it is
necessary, walk only on the pans
at purlin locations after sheets
have been secured.
3.
Repeat for the other side.
ROOF SHEETS
Hardwood with
25mm saw cut.
Slot roof sheet into
cut in wood and
bend