background image

1. EXCAVATION

T = Per Structural Engineer

2. END RAIL & LEG ATTACH

3. SUPPORT LUMBER ATTACH

5. CHANNEL PLACE AND ALIGN

4. DISCHARGE PLACE & ALIGN

Locate and Align Outlet Channel First. Start

at Deep End and Work to Shallow End.

6. RAIL CONNECTION

Tie Wire

T

1/2" Min.

Above Dirt

Finished Grade
Elevation

Support

Lumber

2" Min.

Anchor Slab

Above U-Leg

T

T

End rail must be oriented

with tabs facing out

Align and Set Channels to Grade.

Secure to Grade Stakes.

Caulk Channel Joints
as Specified

Locate and Drive Grade

Stakes Where Needed

Grade Stake

Set Top of Rails to

Finished Elevation

End Rail

Blank or Horiz.
Outlet End Plate
(as Specified)

Vertical

Outlet Piping

(as Specified)

Caulk or Adhesive

(as Specified)

Install Remaining Leg

Bracket Screws After

Positioning Channels.

Reviews: