7085 NW 46
th
Street, Miami, FL 33166 - USA. Telephone: 305-8058533 Fax: 305-8058535
PI 3300 Page # 11
These next steps will assist the operator in starting up the machine and tuning the filler:
a)
Once the conveyor has been mounted in place on the machine, place the machine in
the working location and level the conveyor by adjusting of the four (04) large screws
(GI3100-01-090, shown in figure 1) on the bottom frame rails.
b)
After the filler has been leveled, check to be sure that all of the switches on the
control panel are in the OFF position.
c)
Connect the main power cord to an electrical supply with 220VAC (1 phase, 1 neutral
and ground feeder), 60Hz. Make sure the Emergency Stop button is depressed at this
time.
d)
Connect an airline to the quick connect fitting on the filler’s regulator (right side of
control panel). Make sure the emergency disconnect is stopping the flow of air to the
machine at this time.
e)
At this time, the machine should be ready to run. However, before putting the
machine into production. We highly recommend cleaning the filler and all
components thoroughly, prior to operation. After cleaning, it is also recommended
that any filler components that will come in direct contact with the product be cured
with the product being filled prior to starting a production run.
IV.
SYSTEM REQUIREMENTS FOR STARTING UP THE MACHINE
•
Electrical requirements: 220 VAC, 20A (the main plug must have a solid ground
connection).
•
Pneumatic requirements: 20 CFM @80 PSI