6
MONTANA INSTALL ATION MANUAL
BATH FITTING
1
Before the bath is in its final position identify the
best position for the taps, mark and drill the bath as
needed. Install the waste and overflow to the bath.
2
Remove and dispose of the wooden
transportation board/pallet but
KEEP THE FOUR
SLOTTED FOOT BRACKETS
� See
FIG. 4
�
NOTE
It is imperative the bath is correctly
level in all planes, as any distortion will cause
the seal around the door to leak.
3
Offer bath to required position and place into
exact position� Level using the feet situated in
each bath corner only
� Place the rear slotted
foot brackets with the slots positioned so that
the bath may be slid out of position and the
foot mounting brackets left in place�
NOTE
Ensure the slot in the bracket is facing out.
4
Mark fixing centres for the brackets, remove the
bath leaving brackets in place� Fix rear slotted
feet brackets securely to the floor. See
FIG. 5
�
5
Slide the bath back into position and adjust the
four corner feet to level the bath� Do this by
loosening the top locking nuts beneath the
frame, then use the bottom nuts to adjust the
height until the bath is level� Tighten the top
locking nuts into place once again� Offer up the
foot brackets to the front feet and fix securely
to the floor, locking the middle nut to the foot
brackets to secure bath� See
FIG. 6
�
6
Secure the two support feet by loosening the
top nuts, lower the feet until they are sitting
on the floor and taking the weight of the bath.
Once in position lock off the two top nuts�
Check the bath is level and ensure that
the weight is evenly carried.
Transport
board/pallet
Slotted foot
bracket
Wall
FIG. 4
FIG. 5
FIG. 6
Slotted feet brackets
Support feet