Front Panel Layout
1-9
1
Start Here
Index
Contents
Front Panel Layout
Note: When using SCSI devices, including 2Xtreme, connected through a SCSI chain
to a workstation, ALWAYS power the workstation up last (after all SCSI devices) and
ALWAYS shut the workstation off first (before all SCSI devices). This protects against
accidental data loss and possible damage to the workstation or SCSI devices.
Floppy Disk Drive– Used to load new software from
3.5 inch diskette, or as an emergency boot drive.
The Reset button resets the CPU and causes a warm
boot to take place.
The Power button turns the unit on or off. The LED
lights when power is on.