background image

 

Description 

The 

Accu-Tab PowerBase

 3070AT chlorination system incorporates a patented 

PPG chlorinator into a compact plug and play system.  Included in the system is 
an integrated, level controlled solution tank and a centrifugal pump.  The flow rate 
through the system is controlled by a manually adjusted valve located on the    
discharge of the pump.  The solution tank level is controlled by a float valve.  As 
solution is pulled from the tank, the float valve opens allowing water to flow to 
the chlorinator, contacting the tablets, and then draining into the solution tank.   
 
The chlorination system is designed for use ONLY with PPG 

Accu-Tab

 

 

Blue

 SI 

tablets utilizing the PPG patented erosion feeder technology that erodes only the 
bottom layer of tablets on the sieve plate, while keeping tablets above the sieve 
plate dry and ready for use.  Tablets other than PPG 

Accu-Tab

  

Blue SI

 tablets will 

have different delivery rates, resulting in improper chlorine delivery.  The PPG 

PowerBase

 3070AT is protected under patent #5,427,748.  

Installation Instructions 

1.  Place the chlorination system in a location near the place of application. 
2.  Level the system.  This is important for proper chlorine delivery. 
3.  Connect the inlet flow meter assembly to the solution tank.  (the parts were 

shipped loose to prevent breakage in shipping) 

 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 

4.  Connect the inlet water supply with 1-1/2” PVC pipe or hose. Include an isola-

tion valve in the line.  

Summary of Contents for PowerBase 3070AT

Page 1: ...ets only Do not mix Cal Hypo tablets with stabilized chlorine or bromine products or other sanitizing chemicals Fire or explosion could result Rev 04 26 10 NSF 50 The PowerBase 3070AT Chlorinator is N...

Page 2: ...or use ONLY with PPG Accu Tab Blue SI tablets utilizing the PPG patented erosion feeder technology that erodes only the bottom layer of tablets on the sieve plate while keeping tablets above the sieve...

Page 3: ...e chlorine application point with 1 1 2 PVC pipe or hose Include an isolation valve in the line 9 Plug the power cord into an 110v receptacle 10 If a chemical controller is utilized plug the controlle...

Page 4: ...4...

Page 5: ...maximum inlet flow is determined 6 Adjust flow through feeder using the discharge gate valve The chlorine delivery is determined by the flow rate through the chlorinator Use the graph above to determ...

Page 6: ...on system may develop a build up of scale This should be cleaned on a periodic basis up to twice per year If scale formation is severe more frequent cleanings may be necessary Cleaning may be accompli...

Page 7: ...hrough the blue tubing Circulate for 10 minutes 10 Open all valves to begin purging acid from system 11 Wash the walls and sieve plate of the feeder with a hose to remove all acid residue Chlorine gas...

Page 8: ...8 Electrical Drawing Base System...

Page 9: ...mpers between Terminal 1 4 Terminal 2 6 Electrical Drawing With HHL Pump Switch If a chemical controller is NOT used with the HHL Pump Switch the jumpers should be placed between Terminals 1 and 4 Ter...

Page 10: ...talled and operated and maintained in accordance with this manual and the instructions ac companying the System iii you at your cost promptly return the System or defective part to such location as ma...

Page 11: ...11...