background image

ACCUCRAFT COMPANY

33268 Central Avenue

Union City, CA 94587

Tel: 510-324-3399

Fax: 510-324-3366

Copyright 2014

Instruction Manual

SOUTHERN PACIFIC

2-6-0 M-6

ELECTRIC

Summary of Contents for SOUTHERN PACIFIC 2-6-0 M-6 ELECTRIC

Page 1: ...ACCUCRAFT COMPANY 33268 Central Avenue Union City CA 94587 Tel 510 324 3399 Fax 510 324 3366 Copyright 2014 Instruction Manual SOUTHERN PACIFIC 2 6 0 M 6 ELECTRIC ...

Page 2: ...omotives were originally built for and used in general freight service however as the years went by and trains got heavier and longer they were relegated to lighter duties such as secondary freight and passenger trains branch line locals and yard switching duties The M 6 was found to be excellent for working on light rail in tight clearances and on the curvature found around industries and packing...

Page 3: ...e wiring Diagram at the rear of this manual The lights on this locomotive are LEDs rated at 6 volts Your locomotive and tender are elec trically connected via 12 prong plug at the rear of the locomotive under the rear deck The plug takes the place of the usual wireless drawbar that has tradition ally been found on metal locomotive models The drawbar on this model is just what its name implies a dr...

Page 4: ...e cast transfer box Pittman motor Technical Specifications Scale 1 32 Gauge 45 mm Mini Radius 48 in Dimensions 28 54x3 75x5 79 in Power 0 24V DC Be sure to leave at least 3 clear ance measured from the inner rail to allow for overhang Caution This model is an accurate replica of the original locomotive It has sharp and moving parts The locomotive drive rods are stainless steel with sharp edges OPE...

Page 5: ...ton rods etc that is visible to you Make sure you lubricate the locomotive and tender axle s journals as well Do not over lubricate since excess oil only picks up unwanted dirt Be careful to keep lubrication off the painted surfaces to avoid having shiny areas Use a type of oil that is a bit heavier to lubricate the axle bushings and pivot points of the lead and trailing trucks The main gear box i...

Page 6: ...ses We ship via UPS with insurance coverage to its full valve Please contact UPS if package is damaged Each locomotive is packed under UPS guidelines for shipping We do not warrant any damage resulted from re packing by any party other than Accucraft Trains 5 Instruction Manual SP 2 6 0 M 6 6 Please read following directions be fore unpacking your locomotive 1 Remove foam around the locomo tive Sl...

Reviews: